Summary
Work includes temporary traffic control, 4 EA intake protection, 1255 LF filter sock, 3023 SY pavement, driveway & sidewalk removal, 1 EA remove intake, 27 LF remove storm sewer pipe - under 36" dia., remove landscaping, 10 LF sanitary sewer, 6" lateral, 30 LF pipe repair, 8" sdr 26, pvc, 1 EA manhole adjustment, major, 3 EA manhole adjustment, minor, 2 EA inlet adjustment, minor, single, 100 ton temporary aggregate surface, 1750 LF perforated drain tile, 4", 650 SY subgrade treatment, engineering fabric, 250 ton granular stabilization material, 2892 SY subbase, granular material, 6", 2692 SY pcc pavement, 6", 297 SY pcc driveway, 6", 306 SF pcc sidewalk, 4", 20 SF detectable warning surface, 4 EA sump drain connection, 4 EA downspout outlet. See outside link.