New construction of the public works and fleet facility which includes: Disturbance of 11.2 Acres of 22 Acre site. New entry drive from Georgia Highway 110, pavedparking areas, underground water and sewer services, site lighting system; installation of new paved and unpaved parking areas, new irrigation system, new fuel island, chain link fencing, automatic gate system, flag pole, new site sidewalks, site and field grading, detention pond and swales, landscaping; lighting poles, fixtures, circuits, and controls for the new parking lot lighting systems, and all panels and feeders shown on the electrical drawings. 14,000GSF Pre-Engineered Metal Building systems (PEMB) over 4” and 6” reinforced concrete slab, 5 ton bridge carne, storage mezzanine, 2 hour rated steel stud wall between Office areas (5,011GSF) and Shop Areas (9,069GSF), electrical/manual overhead doors, acoustical tile ceilings, gypsum board ceilings, Cabinetry with solid surface and laminated countertops, toilet fixtures, toilet partitions, toilet accessories, exterior storefront systems, ceramic tiling, pipe bollards, carpet tile, Luxury Vinyl Plank (LVT) flooring, painted concrete, rubber floor base, wood and metal doors, hollow metal frames, domestic cold and hot water systems with tank and tankless water heaters, ventilated and heated shop areas with fume extractor(s), exhaust fans, HVAC VRF systems, HVAC Split Systems, HVAC System controller, LED lighting, Low voltage systems, ERRC System, CCTV and DATA, Diesel Fuel Generator, 2 single phase pad mounted transformers connected in high-leg configuration to provide 240V, 3 -phase (high leg) System. Additive Alternates for Additional Garage Storage, Covered Equipment Storage Canopy, Large Equipment Storage Canopy and Covered Repair vehicle Parking.
Available