Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes replacement of existing standby generators and automatic transfer switches and providing natural gas service.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of a new emergency backup generator and transfer swtich installation at two (2) plants. The installation of a new diesel-fuel generator with a sound-attenuating enclosure, the concrete generator pad, generator platform, and grading of the existing site. The installation of a new ATS. The installation of a load bank for the generator
Posted Date
-
Due Date
Jan 27, 2026
Close: Jan 27, 2026
Construction of a new emergency backup generator and transfer swtich installation at two (2) plants. The installation of a new diesel-fuel generator with a sound-attenuating enclosure, the concrete generator pad, generator platform, and grading of the existing site. The installation of a new ATS. The installation of a load bank for the generator
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include upgrade the generator control system for three existing Cummins 1MW (1000kW) generators and replace the existing automatic transfer switch (ATS) to improve system reliability, performance, and compliance with current standards.
Posted Date
Jan 16, 2026
Due Date
Feb 12, 2026
Release: Jan 16, 2026
Close: Feb 12, 2026
Work include upgrade the generator control system for three existing Cummins 1MW (1000kW) generators and replace the existing automatic transfer switch (ATS) to improve system reliability, performance, and compliance with current standards.
AvailableProvide maintenance and repair services for maintenance, repair, and/or replacement of lift and pump stations.
Posted Date
Jan 5, 2026
Due Date
Jan 27, 2026
Release: Jan 5, 2026
Close: Jan 27, 2026
Provide maintenance and repair services for maintenance, repair, and/or replacement of lift and pump stations.
AvailableMowing at tanks, pump houses, and lift stations.
Posted Date
Dec 16, 2025
Due Date
Feb 4, 2026
Release: Dec 16, 2025
Close: Feb 4, 2026
Mowing at tanks, pump houses, and lift stations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →