Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Elevator Upgrades.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide elevator upgrades at various schools.
Posted Date
Nov 10, 2025
Due Date
Dec 18, 2025
Release: Nov 10, 2025
Close: Dec 18, 2025
Provide elevator upgrades at various schools.
AvailablePremium
Access the largest public sector contact database
This Request for Proposals (RFP) is for Schindler Elevator Upgrades. It is issued by the Panama City – Bay County Airport and Industrial District in Florida. The scope of work involves upgrading the button panels in all elevators.
Posted Date
Dec 10, 2025
Due Date
Dec 19, 2025
Release: Dec 10, 2025
Close: Dec 19, 2025
This Request for Proposals (RFP) is for Schindler Elevator Upgrades. It is issued by the Panama City – Bay County Airport and Industrial District in Florida. The scope of work involves upgrading the button panels in all elevators.
AvailableThe purpose of this project is to obtain a service to rehabilitate the freight elevator. This project will consist of removing the jack assembly, including handling the disposal of waste hydraulic fluid, installing a protective casing around the jack assembly, installing a new jack assembly, demolishing the elevator interior, installing the new elevator interior, demolishing the existing elevator controller, demolishing the existing elevator pump and housing unit, installing a new elevator controller, installing a new elevator pump and housing unit, demolishing and replacing the door and hallway fixtures, refurbishing and/or replacing elevator door assemblies, fireproofing both elevator shaft and mechanical room, installing a split-system hvac unit, and all other work described in the plan set and specifications.
Posted Date
Nov 3, 2025
Due Date
Dec 17, 2025
Release: Nov 3, 2025
Close: Dec 17, 2025
The purpose of this project is to obtain a service to rehabilitate the freight elevator. This project will consist of removing the jack assembly, including handling the disposal of waste hydraulic fluid, installing a protective casing around the jack assembly, installing a new jack assembly, demolishing the elevator interior, installing the new elevator interior, demolishing the existing elevator controller, demolishing the existing elevator pump and housing unit, installing a new elevator controller, installing a new elevator pump and housing unit, demolishing and replacing the door and hallway fixtures, refurbishing and/or replacing elevator door assemblies, fireproofing both elevator shaft and mechanical room, installing a split-system hvac unit, and all other work described in the plan set and specifications.
AvailableProvision of cooling tower upgrades.
Posted Date
Nov 21, 2025
Due Date
Dec 19, 2025
Release: Nov 21, 2025
Close: Dec 19, 2025
Provision of cooling tower upgrades.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis