Summary
The campground work involves replacement of site amenities to include but not limited to picnic tables, fire rings, electrical pedestals, water hydrants and unit number posts. Parking spurs and campground roads need to be repaved to provide campsites large enough to accommodate the larger campers that have come into use since the campground was built in the 1990s. The host site is also in need of refurbishment for wastewater collection and site amenities. The electrical distribution system and campsite electrical pedestals need to be replaced. The potable water supply lines and valves that supply water hookups at each camp unit and at the restroom facilities will need to be replaced. The campground bathhouse will be replaced as well as the wastewater system. The well house building will be replaced as well as new sidewalks connecting site features. See attached file.