Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The inspection, cleaning and certifying of the fire detection system. Annual testing of fire detection system will include but not limited to: tests of the control panel equipment, functional tests of audible and visual signaling devices and initiating appliances, such as smoke/heat/duct detectors, manual pull stations, water-flow and tamper switches.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Federal Bureau of Prisons (BOP) – FCI Phoenix (37900 N 45th Avenue, Phoenix, AZ) issued a presolicitation to inspect, clean, test, and certify the facility’s fire detection and suppression systems in accordance with NFPA 72 and NFPA 25. The work includes full-system testing (control panels, initiating devices, audible/visual signals), cleaning 20% of initiating devices, ONYXWorks/Notifier system updates, and NFPA-compliant fire suppression inspections; at least one technician must be certified on Notifier/ONYXWorks. The opportunity was posted Jan 5, 2026 and is set aside for Small Business (NAICS 561621); responses are due Jan 20, 2026 at 1:00 p.m. EST.
Posted Date
Jan 5, 2026
Due Date
Jan 20, 2026
Release: Jan 5, 2026
Close: Jan 20, 2026
The Federal Bureau of Prisons (BOP) – FCI Phoenix (37900 N 45th Avenue, Phoenix, AZ) issued a presolicitation to inspect, clean, test, and certify the facility’s fire detection and suppression systems in accordance with NFPA 72 and NFPA 25. The work includes full-system testing (control panels, initiating devices, audible/visual signals), cleaning 20% of initiating devices, ONYXWorks/Notifier system updates, and NFPA-compliant fire suppression inspections; at least one technician must be certified on Notifier/ONYXWorks. The opportunity was posted Jan 5, 2026 and is set aside for Small Business (NAICS 561621); responses are due Jan 20, 2026 at 1:00 p.m. EST.
AvailableConduct the required periodic fire alarm and suppression system testing and inspection within DOC facilities.
Posted Date
Dec 16, 2025
Due Date
Jan 20, 2026
Release: Dec 16, 2025
Close: Jan 20, 2026
Conduct the required periodic fire alarm and suppression system testing and inspection within DOC facilities.
AvailableThe State of Maine Department of Corrections is soliciting proposals for testing and inspection services for fire alarm and fire suppression systems across its correctional facilities. The contractor will perform testing/inspection of fire alarms, sprinkler systems, hydrants and other protective equipment, provide 24/7 emergency response capability, and maintain tracking/reporting of defects. The contract initial period of performance runs from March 1, 2026 to June 30, 2028 with two optional renewal periods.
Posted Date
Dec 16, 2025
Due Date
Jan 20, 2026
Release: Dec 16, 2025
Close: Jan 20, 2026
The State of Maine Department of Corrections is soliciting proposals for testing and inspection services for fire alarm and fire suppression systems across its correctional facilities. The contractor will perform testing/inspection of fire alarms, sprinkler systems, hydrants and other protective equipment, provide 24/7 emergency response capability, and maintain tracking/reporting of defects. The contract initial period of performance runs from March 1, 2026 to June 30, 2028 with two optional renewal periods.
Fire Alarm System Inspection and Repair.
Posted Date
Aug 26, 2025
Due Date
Jan 8, 2026
Release: Aug 26, 2025
Close: Jan 8, 2026
Fire Alarm System Inspection and Repair.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis