Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Cured-In-Place (CIP) lining of approx. 3,200 LF of 8" diameter sanitary sewer main, the testing and sealing of approx. 73 sewer laterals, and refurbishing of approx. 130 vertical feet of sanitary sewer manholes and all other ancillary work. Including 73 UN reestablish sewer lateral; 73 units test/seal sewer lateral; 140 VF refurbish manhole; 10 units remove & replace manhole steps(If & where directed).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
2026 sanitary sewer rehabilitation. Construct 2026 Sanitary Sewer Rehabilitation project including all labor, materials, and equipment necessary to construct approx. 2,438 LF of Cured in Place Pipe (CIPP) sewer main lining, pre and post internal video inspection, prerehabilitation cleaning, root cutting, protruding service removal, service reinstatement, pressure testing of service connections, injection grouting of service connections, mobilization, traffic control and miscellaneous work, including cleanup.
Posted Date
Jan 20, 2026
Due Date
Feb 12, 2026
Release: Jan 20, 2026
Close: Feb 12, 2026
2026 sanitary sewer rehabilitation. Construct 2026 Sanitary Sewer Rehabilitation project including all labor, materials, and equipment necessary to construct approx. 2,438 LF of Cured in Place Pipe (CIPP) sewer main lining, pre and post internal video inspection, prerehabilitation cleaning, root cutting, protruding service removal, service reinstatement, pressure testing of service connections, injection grouting of service connections, mobilization, traffic control and miscellaneous work, including cleanup.
AvailableThe Project will include rehabilitation work for existing 8", 10", 12", and 15" sanitary sewer pipe including approx: 13,248 LF of Cured-in-Place-Pipe Structural Fiberglass Liner and required service sealings. The work shall include all bypass pumping, erosion and traffic control, and other related improvements and appurtenances.
Posted Date
Jan 8, 2026
Due Date
Feb 10, 2026
Release: Jan 8, 2026
Close: Feb 10, 2026
The Project will include rehabilitation work for existing 8", 10", 12", and 15" sanitary sewer pipe including approx: 13,248 LF of Cured-in-Place-Pipe Structural Fiberglass Liner and required service sealings. The work shall include all bypass pumping, erosion and traffic control, and other related improvements and appurtenances.
Project consists of rehabilitating, preparing, and lining sanitary manholes.
Posted Date
-
Due Date
Feb 17, 2026
Close: Feb 17, 2026
Project consists of rehabilitating, preparing, and lining sanitary manholes.
AvailableThe City of Smithville, Missouri requests sealed proposals for sanitary sewer rehabilitation work including cured-in-place pipe and manhole rehabilitation. The base bid includes approximately 1,850 feet of CIPP and 123 vertical feet of sanitary sewer manhole rehabilitation, with a 5% bid security requirement. Bids are due at City Hall on February 19, 2026 at 2:00 PM CT, with contract documents available via the Drexel Technologies eDistribution plan room.
Posted Date
Jan 15, 2026
Due Date
Feb 19, 2026
Release: Jan 15, 2026
Close: Feb 19, 2026
The City of Smithville, Missouri requests sealed proposals for sanitary sewer rehabilitation work including cured-in-place pipe and manhole rehabilitation. The base bid includes approximately 1,850 feet of CIPP and 123 vertical feet of sanitary sewer manhole rehabilitation, with a 5% bid security requirement. Bids are due at City Hall on February 19, 2026 at 2:00 PM CT, with contract documents available via the Drexel Technologies eDistribution plan room.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis