Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 29,900 SF complete preparation of all existing surface; 29,900 SF installation of type 3 slurry leveling court; 29,900 SF installation of chip seal; 29,900 SF installation of type 2 slurry cape seal; 1 LS placement of pavement markings. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Proposing to combine multiple paving projects into one complete project. The projects consist of 4 roads requiring a complete Pulverization and 3" thick pavement installation as well as 1 road requiring an full width 3" surface mill and 3" overlay. The Pulverization and pave projects will consist of the complete pulverization of existing pavement while mixing recycled asphalt into the subgrade to create a solid road base. The pavement installation would consist of¾" asphalt. The full width surface mill and overlay projects will consist of a full width 3" mill of the existing roadway. See outside link.
Posted Date
Dec 29, 2025
Due Date
Jan 29, 2026
Release: Dec 29, 2025
Close: Jan 29, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Proposing to combine multiple paving projects into one complete project. The projects consist of 4 roads requiring a complete Pulverization and 3" thick pavement installation as well as 1 road requiring an full width 3" surface mill and 3" overlay. The Pulverization and pave projects will consist of the complete pulverization of existing pavement while mixing recycled asphalt into the subgrade to create a solid road base. The pavement installation would consist of¾" asphalt. The full width surface mill and overlay projects will consist of a full width 3" mill of the existing roadway. See outside link.
Request for proposals for engineering services for FY 2026 CDBG project(s).
Posted Date
-
Due Date
Jan 7, 2026
Close: Jan 7, 2026
Request for proposals for engineering services for FY 2026 CDBG project(s).
AvailableWork includes approx., 84,500 SY of chip seal and 84,500 SY of single course micro-surfacing on various roads.
Posted Date
Dec 22, 2025
Due Date
Jan 15, 2026
Release: Dec 22, 2025
Close: Jan 15, 2026
Work includes approx., 84,500 SY of chip seal and 84,500 SY of single course micro-surfacing on various roads.
AvailableProcurement of services for hot applied placement of crack and mastic seal materials on city roadways, parking lots, and multi-use paths.
Posted Date
Dec 10, 2025
Due Date
Jan 14, 2026
Release: Dec 10, 2025
Close: Jan 14, 2026
Procurement of services for hot applied placement of crack and mastic seal materials on city roadways, parking lots, and multi-use paths.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →