Close
City of Princeton
The material required is as follows: • 15 kV Padmount Switchgear (Dead-Front, Air-Insulated, Fused) • 15 kV Primary Power Cable • Single Phase Padmount Distribution Transformers • Three Phase Padmount Distribution Transformers • 600A Deadbreak Elbows
Alta Municipal Utilities
The equipment to be supplied is described in general as follows: Primary Cable Fittings, Primary and Secondary Pedestals, Secondary Connectors, Fault Indicators, Cable Sealing and Identification Material, Grounding Materials, Overhead Materials.
Milford Municipal Utilities
The equipment to be supplied is described in general as follows:\r Primary Cable Fittings, Grounding Materials, Primary Pull Boxes, Primary Pedestals
Orange Co Sanitation District
Qualified Design-Builders to perform progressive DESIGN/BUILD services, including design and construction support services for the Headworks electrical distribution improvements at Plant No. 2 project.
Release
Oct 23, 2025
Close
Nov 05, 2025