Special DistrictNY
Posted
Oct 3, 2026
Oct 14, 2026
Furnace Repair and Service (Request for Proposal)
Furnace repair and service at the fire station.
Description: Provide all labor, materials, equipment, permits, disposal, testing, and documentation necessary to complete the furnace replacement. At a minimum, proposals should include the following work: remove and properly dispose of the existing furnace and related materials; provide and install a new furnace sized according to the property's heating load and existing system requirements; specify furnace manufacturer, model number, BTU input and output, AFUE efficiency rating, fuel type, staging, and blower type; inspect, connect, and modify ductwork, gas piping, combustion air, flue venting, condensate drainage, thermostat wiring, and electrical connections as required. See attached file.
City · MI, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalThese related opportunities are still open for bidding.
Special DistrictNY
Posted
Oct 3, 2026
Oct 14, 2026
Furnace repair and service at the fire station.
Tomball Independent School District
School DistrictTX
Posted
Sep 24, 2026
Oct 27, 2026
Provide construction services for a chiller replacement project.
SchoolPA
Posted
Sep 16, 2026
Oct 23, 2026
Work include removal and replacement of five (5) sets of exterior storefront-style doors. Remove and dispose of existing door assemblies. Furnish and install five (5) new commercial storefront-style door sets. Provide frames and doors with appropriate safety/insulated glazing. Provide new commercial-grade door hardware, closers, thresholds, weather stripping, and necessary sealants. Complete all necessary installation and finish work.
CountyGA
Posted
Sep 23, 2026
Oct 22, 2026
Provide turnkey roof-top chiller replacement services which includes providing equipment, labor, materials, and all related work necessary for complete installation and operational functionality. The replacement chiller must be of similar tonnage, must be air-cooled, must be equipped with low ambient, and must include a sound dampening package to maintain lower noise levels during operation.