Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of WWTP Phase 1.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
River Plantation Municipal Utility District is soliciting bids for rehabilitation of an existing drainage channel, including concrete lining and storm sewer replacements in Montgomery County, Texas. A non-mandatory pre-bid meeting will be held remotely on November 21, 2025 at 10:00 AM. Bids will be received electronically via CivCast and opened by Vogler and Spencer Engineering; bids are due December 12, 2025 at 10:00 AM CST.
Posted Date
-
Due Date
Dec 12, 2025
Close: Dec 12, 2025
River Plantation Municipal Utility District is soliciting bids for rehabilitation of an existing drainage channel, including concrete lining and storm sewer replacements in Montgomery County, Texas. A non-mandatory pre-bid meeting will be held remotely on November 21, 2025 at 10:00 AM. Bids will be received electronically via CivCast and opened by Vogler and Spencer Engineering; bids are due December 12, 2025 at 10:00 AM CST.
Premium
Access the largest public sector contact database
Scope of work of the contract documents includes the following: paving FM 361 turn lanes. 1 LS mobilization, move-in & set up, including bonds & insurance; 1 LS traffic control during construction as per detail sheet 25, all inclusive; complete in place; 1 EA install and remove concrete truck washout; 4,850 LF installation of reinforced filter fabric barrier, as per TxDot details and specs, complete in place; 1 LS street cleaning and maintenance of all temporary controls through the contract period; 606 SY remove and dispose of existing asphalt driveway, all inclusive; complete in place; 1,080 SY mill existing asphalt pavement transition at start and end of pavement widening for preparation of 2" overlay as per detail sheet 24. See attached file.
Posted Date
Dec 1, 2025
Due Date
Dec 18, 2025
Release: Dec 1, 2025
Close: Dec 18, 2025
Scope of work of the contract documents includes the following: paving FM 361 turn lanes. 1 LS mobilization, move-in & set up, including bonds & insurance; 1 LS traffic control during construction as per detail sheet 25, all inclusive; complete in place; 1 EA install and remove concrete truck washout; 4,850 LF installation of reinforced filter fabric barrier, as per TxDot details and specs, complete in place; 1 LS street cleaning and maintenance of all temporary controls through the contract period; 606 SY remove and dispose of existing asphalt driveway, all inclusive; complete in place; 1,080 SY mill existing asphalt pavement transition at start and end of pavement widening for preparation of 2" overlay as per detail sheet 24. See attached file.
AvailableWWTP process, disinfection and electrical improvements, Phase II.
Posted Date
Dec 2, 2025
Due Date
Jan 27, 2026
Release: Dec 2, 2025
Close: Jan 27, 2026
WWTP process, disinfection and electrical improvements, Phase II.
AvailableWork includes sand blast and recoat aboveground piping; remove and replace wet well vertical piping including supports; remove existing t-lock liner and recoat wet well. Includes by-pass pumping.
Posted Date
-
Due Date
Dec 12, 2025
Close: Dec 12, 2025
Work includes sand blast and recoat aboveground piping; remove and replace wet well vertical piping including supports; remove existing t-lock liner and recoat wet well. Includes by-pass pumping.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis