Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The major items of work are: 5,870 Tons Aggregate Surfacing, Class 1; 81,820 SY Stabilized Full Depth Reclamation; 8,905 Tons Type SP 9.5 Wearing Course Mix (2,C); 2 LS Traffic Control; 52,820 LF Paint Striping and other items.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Grading, Bituminous Mill and Surfacing, Full Depth Reclamation and Flashing Beacon System
Posted Date
Jan 28, 2026
Due Date
Feb 25, 2026
Release: Jan 28, 2026
Close: Feb 25, 2026
Grading, Bituminous Mill and Surfacing, Full Depth Reclamation and Flashing Beacon System
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes mill bituminous surface, cold in place recycling, full depth reclamation, aggregate base, bituminous overlay and aggregate shoulders. 1,941 CY subgrade excavation (EV); 4,852 TN aggregate base, class 2; 30,326 SY full depth reclamation; 234 TN bituminous material for mixture; 5,956 TN shoulder base aggregate, class 2; 1,351 SY mill bituminous surface (3"); 7,500 gal bituminous material for fog seal; 16,682 TN type SP 12.5 wearing course mixture (3,C); 57,468 SY cold-in-place recycled/cold central plant recycling; 25,928 LF 4" solid line paint; 62,704 LF 6" solid line paint; 7,150 LF 4" broken line paint; 3,042 LF 4" double solid line paint; 80 LF 24" solid line paint; 199 SF pavement message paint.
Posted Date
Jan 21, 2026
Due Date
Feb 17, 2026
Release: Jan 21, 2026
Close: Feb 17, 2026
Project includes mill bituminous surface, cold in place recycling, full depth reclamation, aggregate base, bituminous overlay and aggregate shoulders. 1,941 CY subgrade excavation (EV); 4,852 TN aggregate base, class 2; 30,326 SY full depth reclamation; 234 TN bituminous material for mixture; 5,956 TN shoulder base aggregate, class 2; 1,351 SY mill bituminous surface (3"); 7,500 gal bituminous material for fog seal; 16,682 TN type SP 12.5 wearing course mixture (3,C); 57,468 SY cold-in-place recycled/cold central plant recycling; 25,928 LF 4" solid line paint; 62,704 LF 6" solid line paint; 7,150 LF 4" broken line paint; 3,042 LF 4" double solid line paint; 80 LF 24" solid line paint; 199 SF pavement message paint.
AvailableProcurement of bituminous surfacing services for various locations in Carlton County, including subgrade preparation, aggregate surfacing, full depth reclamation, milling, asphalt membrane, and wearing course mixes.
Posted Date
Jan 16, 2026
Due Date
Feb 19, 2026
Release: Jan 16, 2026
Close: Feb 19, 2026
Procurement of bituminous surfacing services for various locations in Carlton County, including subgrade preparation, aggregate surfacing, full depth reclamation, milling, asphalt membrane, and wearing course mixes.
AvailableFull depth reclamation of existing asphalt, Apshalt removal and replacement, HMA patching, storm sewer install, removal and replacement of concrete curb ramps, sidewalk, curb, gutter, valley pans, cross pans at multiple locations.
Posted Date
Jan 16, 2026
Due Date
Feb 13, 2026
Release: Jan 16, 2026
Close: Feb 13, 2026
Full depth reclamation of existing asphalt, Apshalt removal and replacement, HMA patching, storm sewer install, removal and replacement of concrete curb ramps, sidewalk, curb, gutter, valley pans, cross pans at multiple locations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →