Summary
Project contemplated consists of\r • Demolition of existing trees, rootballs, pavements, foundations, and floodwalls.\r • Excavation and off-site landfilling of approximately 1,075 cubic yards of soils.\r • Construction of approximately 1,760 feet of an existing earthen levee raise.\r • Construction of approximately 750 linear foot concrete floodwall cap extension (raises).\r • Maintenance repairs to existing concrete floodwalls such as spalling of concrete, crack\r formation and expansion sealing, construction joint sealant material damage, and\r waterstop damage repair.\r • Construction of approximately 325 feet of permanent two-rail timber fence.\r • Construction of approximately 96 feet of 30-inch RCP storm sewer and appurtenances.\r • Installation of 30-inch storm sewer outfall structure and flap gate.\r • Construction of 90 feet of 8-inch PVC sanitary sewer.\r • Installation of two new sanitary sewer manholes along the new 8-inch PVC sanitary\r sewer line.\r • Adjust the grade of one existing City of Wauwatosa sanitary sewer manhole.\r • Installation of a cast-in-place concrete backflow prevention structure and in-line check\r valve within the 72-inch storm sewer.\r • Adjust the grade of two City of Wauwatosa storm manholes along the 72-inch storm\r sewer.\r • Installation of two manholes over the Schoonmaker Creek double box culvert.\r • Construction of approximately 300 feet of an access ramp at Schoonmaker Creek outfall.\r • Concrete pavement, asphalt, turf, and native vegetative restoration of all disturbed areas.\r • 5-year post-construction vegetation maintenance period for disturbed areas adjacent to\r Honey Creek Parkway.