Franklin Street Stormwater Repair
This project includes a stormwater junction manhole, 355' of 36" HDPE stormwater pipe, instillation, remove and replace existing drive entrance within the City of Leavenworth
Description: This project includes a stormwater junction manhole, 355' of 36" HDPE stormwater pipe, instillation, remove and replace existing drive entrance within the City of Leavenworth
City · KS, US
Decision makers connected to this RFP from City of Leavenworth.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
434 days before RFP
Public Works presented a planned city stormwater programme addressing projects, failed CMPs and associated sinkholes, with manhole rehabilitation planned for later fall.
bridge are completed. Uh storm water projects involved park 6th Avenue and Chestnut 14th and Osage and numerous failed CMPS and associated sinkholes throughout our town. Uh far as WPC, a new switch gear is being designed for WPC. It's bidding later in 25 with the 26 construction. Uh new screw uh press for our deatering of our sludge. Uh that has been…
Leavenworth City Commission City Commission Meeting
Board meeting · Aug 19, 2025
Annual financial report
300 days before RFP
The City’s stormwater impact fee generated $1,323,536 in 2025 to fund numerous citywide stormwater reconstruction, rehabilitation, restoration and curb-inlet projects.
maintenance of the storm water system. In 2025 the fee generated $1,323,536 to address specific projects. The fee has generated approximately $10.6 million through 2025. These fees fund numerous projects throughout the City which include the major reconstruction projects at 2nd and Chestnut streets and all along the 3-mile Creek basin. This area of the City…
City of Leavenworth, Kansas Annual Comprehensive Financial Report FY2025
Annual financial report · Dec 31, 2025
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (26 days left)
Adjacent opportunities open for bidding right now.
CityKS
Posted
Oct 27, 2026
Dec 2, 2026
This project includes a stormwater junction manhole, 355' of 36" HDPE stormwater pipe, instillation, remove and replace existing drive entrance within the City of Leavenworth
Special DistrictPA
Posted
Oct 15, 2026
Nov 18, 2026
Milling and overlay, decommissioning pipes by means of bulkheading and flowable fill, installation of new stormwater structures and pipes, and trench restoration.
CityCA
Posted
Sep 23, 2026
Nov 9, 2026
This project consists of the removal for the existing diverter pump, partial demolition of existing storm drain diversion structure, and installation of pre-engineered fiberglass pump station (owner furnished), pre-cast valve vault with valves, piping and related appurtenances.
Special DistrictIN
Posted
Oct 27, 2026
Nov 10, 2026
Work includes approx. 1,600 LF of 8" PVC C900 DR14 water main by open cut and associated appurtenances, connections to existing water mains, and restoration. It also includes lead water service line replacement throughout the project limits. The project also includes the installation of approx. 1,500 LF of new storm sewer ranging in size from 8" to 15", along with associated structures and connections to the existing storm sewer system.