Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for the stabilization and restoration of approximately 5,130 linear feet of stream within Ankeny in Polk County, Iowa.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This RFP is for the stabilization and restoration of approximately 5,130 linear feet of stream within Ankeny in Polk County, Iowa.
Posted Date
-
Due Date
Jan 22, 2026
Close: Jan 22, 2026
This RFP is for the stabilization and restoration of approximately 5,130 linear feet of stream within Ankeny in Polk County, Iowa.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work includes approx 37,400 CY earthwork and excavation; 74 LF 6" PVC trenched storm sewer; 332 LF 24" RCP trenched storm sewer; 30 SY 6" thickness PCC sidewalk; 23,510 rolled erosion control.
Posted Date
Dec 3, 2025
Due Date
Jan 8, 2026
Release: Dec 3, 2025
Close: Jan 8, 2026
The work includes approx 37,400 CY earthwork and excavation; 74 LF 6" PVC trenched storm sewer; 332 LF 24" RCP trenched storm sewer; 30 SY 6" thickness PCC sidewalk; 23,510 rolled erosion control.
AvailableThe work includes approx 37,400 CY earthwork and excavation; 74 LF 6" PVC trenched storm sewer; 332 LF 24" RCP trenched storm sewer; 30 SY 6" thickness PCC sidewalk; 23,510 rolled erosion control.
Posted Date
Dec 3, 2025
Due Date
Jan 8, 2026
Release: Dec 3, 2025
Close: Jan 8, 2026
The work includes approx 37,400 CY earthwork and excavation; 74 LF 6" PVC trenched storm sewer; 332 LF 24" RCP trenched storm sewer; 30 SY 6" thickness PCC sidewalk; 23,510 rolled erosion control.
AvailableWork will involve streambank grading and stabilization, in-stream structures, and erosion and sediment control measures, per guidelines to be given at the mandatory site showing.
Posted Date
Dec 5, 2025
Due Date
Jan 23, 2026
Release: Dec 5, 2025
Close: Jan 23, 2026
Work will involve streambank grading and stabilization, in-stream structures, and erosion and sediment control measures, per guidelines to be given at the mandatory site showing.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →