Summary
Work includes 100 SY of removal of existing pavement; 1,220 CY of excavation; 500 SY of subgrade reshaping and compacting; 525 SY of yard restoration (4" topsoil, seed and mulch); erosion & water pollution control; 475 SY of mirafi 600x or equivalent woven geotextile; 800 SY of geogrid reinforcement tensar hx 165 or approved equal; 500 SY of asphalt surface (2"); 500 SY of asphalt intermediate (5"); 220 SF of concrete sidewalk; 150 SF of concrete sidewalk with integral curb; 85 LF of 4" rigid perforated pvc underdrain system - includes non-woven geotextile, no. 57 stone and perforated pipe and associated works.