Summary
Work includes Installing approx 1,000' of new 12" gravity sewer, approx 1,000' of new 12" force main sewer, and approx 1,090' of new 11/2" water service line, installing approx 6 new precast concrete manholes, one new air release valve with associated manhole, and one new check valve vault with valve, demolishing the existing building, fabricating and installing a new concrete cover over the existing dry pit, removing and replacing the existing pumps with new submersible pumps, installing a new valve vault with hatches, a new control panel, a new backup diesel generator, and general electrical work, installation of a permanent bypass pump including all fittings, concrete pads, electrical conduits, and piping.