Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Demolition of existing lift station components, including fiberglass pump housing, self-priming pumps and motors, associated electrical equipment, level control equipment, discharge and suction piping/valves, and existing concrete wet well lid, concrete pump platform, manhole wet well access, and 96" RCP wet well down to nearest joint.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
2 EA of Pumps, Lift Station-60P; Parts Lift Station-60P; Spare Parts, Lift Station-60P; Startup Services, Lift Station-60P; Control Panel, Lift Station -60P. 2 EA of Pumps, Lift Station-62P; Parts Lift Station-62P; Spare Parts, Lift Station-62P; Startup Services, Lift Station-62P; Control Panel, Lift Station -62P.
Posted Date
Jan 4, 2026
Due Date
Feb 5, 2026
Release: Jan 4, 2026
Close: Feb 5, 2026
2 EA of Pumps, Lift Station-60P; Parts Lift Station-60P; Spare Parts, Lift Station-60P; Startup Services, Lift Station-60P; Control Panel, Lift Station -60P. 2 EA of Pumps, Lift Station-62P; Parts Lift Station-62P; Spare Parts, Lift Station-62P; Startup Services, Lift Station-62P; Control Panel, Lift Station -62P.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project will consist of upgrades to the existing lift station at the West Jessamine High School site. The upgrades will include replacement of (1) existing manhole with new manhole, reconnection of existing sanitary lines to manhole, replacement of the existing 4" sanitary pipe from manhole to wet well of lift station with new 8" sanitary from manhole to wet well, providing new data rack, new control integration of lift station pump system to district Building Automation System, and installation of new storm drainage consisting of new storm drain outlets, piping, trenching, and patching of asphalt drive.
Posted Date
Sep 26, 2025
Due Date
Feb 12, 2026
Release: Sep 26, 2025
Close: Feb 12, 2026
The project will consist of upgrades to the existing lift station at the West Jessamine High School site. The upgrades will include replacement of (1) existing manhole with new manhole, reconnection of existing sanitary lines to manhole, replacement of the existing 4" sanitary pipe from manhole to wet well of lift station with new 8" sanitary from manhole to wet well, providing new data rack, new control integration of lift station pump system to district Building Automation System, and installation of new storm drainage consisting of new storm drain outlets, piping, trenching, and patching of asphalt drive.
AvailableProject consists of emergency lift station improvements.
Posted Date
Jan 12, 2026
Due Date
Feb 17, 2026
Release: Jan 12, 2026
Close: Feb 17, 2026
Project consists of emergency lift station improvements.
AvailableLift station construction. This construction solicitation will require the full removal and replacement of the lift station. The existing lift station provides wastewater service to the hospital quarters units, and several tribal program buildings. Once installation is complete the new lift station will take the full sanitary load for the area currently being serviced by the existing lift station and be sized to handle expansion in the future. Then the existing lift station consisting of the wet well, dry well, pumps and piping will be demolished. The new lift station will consist of a wet well, a dry well, installation of chopper pumps, and force main connection. This project will also include a new control system to allow the facility to monitor flow into the lift station and the status of the equipment. See attached file.
Posted Date
Jan 21, 2026
Due Date
Mar 2, 2026
Release: Jan 21, 2026
Close: Mar 2, 2026
Lift station construction. This construction solicitation will require the full removal and replacement of the lift station. The existing lift station provides wastewater service to the hospital quarters units, and several tribal program buildings. Once installation is complete the new lift station will take the full sanitary load for the area currently being serviced by the existing lift station and be sized to handle expansion in the future. Then the existing lift station consisting of the wet well, dry well, pumps and piping will be demolished. The new lift station will consist of a wet well, a dry well, installation of chopper pumps, and force main connection. This project will also include a new control system to allow the facility to monitor flow into the lift station and the status of the equipment. See attached file.