Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Floor slab repair and renovation work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work include building renovation. Work covers approx 5,560 SF along the perimeter, that will be converted into new offices. The project includes select interior removals on the first floor of the federal building. Renovating the existing bathrooms, janitor's closet, and corridor. The mechanical fire protection, fire alarm, and electrical systems will be modified to suit the new interior layout. Additionally, installing new finishes such as ceilings, lighting, doors, frames, paint, ceramic tile, and carpeting
Posted Date
Dec 2, 2025
Due Date
Dec 30, 2025
Release: Dec 2, 2025
Close: Dec 30, 2025
Work include building renovation. Work covers approx 5,560 SF along the perimeter, that will be converted into new offices. The project includes select interior removals on the first floor of the federal building. Renovating the existing bathrooms, janitor's closet, and corridor. The mechanical fire protection, fire alarm, and electrical systems will be modified to suit the new interior layout. Additionally, installing new finishes such as ceilings, lighting, doors, frames, paint, ceramic tile, and carpeting
Premium
Access the largest public sector contact database
Naselle hatchery renovation phase 2 project which includes the construction of an exclusion barrier weir, river intake, juvenile resident fish ladder, river intake pump station, adult fishway, auxiliary water supply, adult collection trap, adult holding ponds, reuse pump station and other incidental work at the hatchery.
Posted Date
Dec 8, 2025
Due Date
Feb 5, 2026
Release: Dec 8, 2025
Close: Feb 5, 2026
Naselle hatchery renovation phase 2 project which includes the construction of an exclusion barrier weir, river intake, juvenile resident fish ladder, river intake pump station, adult fishway, auxiliary water supply, adult collection trap, adult holding ponds, reuse pump station and other incidental work at the hatchery.
AvailableThe State University of New York (SUNY) System Administration is soliciting sealed bids for Project No. 361079, Renovate Interior 1st Floor - Federal Building - Phase 1, to convert approximately 5,560 sq ft into new offices and renovate related spaces, including modifications to mechanical, fire protection, fire alarm, and electrical systems. Bids are due to be submitted and publicly opened at 2:00 PM local time on December 30, 2025; a non-mandatory walk-through is scheduled for December 9, 2025. The solicitation is an Invitation for Bid for construction work (not a grant), with MWBE/SDVOB goals and an estimated budget range provided on the listing.
Posted Date
-
Due Date
Dec 30, 2025
Close: Dec 30, 2025
The State University of New York (SUNY) System Administration is soliciting sealed bids for Project No. 361079, Renovate Interior 1st Floor - Federal Building - Phase 1, to convert approximately 5,560 sq ft into new offices and renovate related spaces, including modifications to mechanical, fire protection, fire alarm, and electrical systems. Bids are due to be submitted and publicly opened at 2:00 PM local time on December 30, 2025; a non-mandatory walk-through is scheduled for December 9, 2025. The solicitation is an Invitation for Bid for construction work (not a grant), with MWBE/SDVOB goals and an estimated budget range provided on the listing.
AvailableSlab repair
Posted Date
-
Due Date
Jan 13, 2026
Release: -
Close: Jan 13, 2026
Slab repair
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis