Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes selective removal and re-install of acoustical ceiling tile/grid, demo existing fpb and vav's and install new vavs associated controls and electrical work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Replacement of 34 VAV boxes and all associated piping and insulation in the State House sub-basement crawl space, re-build AHU #1 in basement, completely remove existing honeywell controls system on all devices and equipment throughout State House and install all new JCI Metasys energy management control system on all devices and equipment. Install new LED lights in crawl space.
Posted Date
Dec 15, 2025
Due Date
Jan 29, 2026
Release: Dec 15, 2025
Close: Jan 29, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of 34 VAV boxes and all associated piping and insulation in the State House sub-basement crawl space, re-build AHU #1 in basement, completely remove existing honeywell controls system on all devices and equipment throughout State House and install all new JCI Metasys energy management control system on all devices and equipment. Install new LED lights in crawl space.
Provide engineering analyses and design services to perform decommissioning design for the flagler dam project.
Posted Date
Dec 11, 2025
Due Date
Jan 28, 2026
Release: Dec 11, 2025
Close: Jan 28, 2026
Provide engineering analyses and design services to perform decommissioning design for the flagler dam project.
AvailableThis project consists of flooring replacement at noted locations. Replacement includes removal of existing floor finishes, preparation of existing substrates to receive new floor finish, and installation of new floor finishes.
Posted Date
Jan 6, 2026
Due Date
Feb 4, 2026
Release: Jan 6, 2026
Close: Feb 4, 2026
This project consists of flooring replacement at noted locations. Replacement includes removal of existing floor finishes, preparation of existing substrates to receive new floor finish, and installation of new floor finishes.
AvailableThe project consists of the removal and replacement of track surfacing. Removal and replacement of the synthetic turf. Remove and replace the goal posts. Fencing modifications.
Posted Date
-
Due Date
Feb 10, 2026
Release: -
Close: Feb 10, 2026
The project consists of the removal and replacement of track surfacing. Removal and replacement of the synthetic turf. Remove and replace the goal posts. Fencing modifications.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →