Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of new thermal dryer facility. Construction of new final effluent water pump station. Modifications to existing solids electrical building. Modifications to existing compressor building. Modifications to existing dewatering building no. 1 and no. 2 associated site work, including site civil, site piping, stormwater control, and site electrical work. Associated structural work for new and existing facilities. Associated electrical and instrumentation and controls for new and existing facilities.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Cherokee County Water & Sewerage Authority seeks bids for constructing a Thermal Dryer Facility at Fitzgerald Creek WPCP, including a new effluent pump station and modifications to existing buildings. The project requires labor, materials, and equipment for construction, site work, and electrical and instrumentation controls. Bidders must comply with Georgia laws and attend a mandatory pre-bid conference.
Posted Date
-
Due Date
Dec 17, 2025
Close: Dec 17, 2025
Cherokee County Water & Sewerage Authority seeks bids for constructing a Thermal Dryer Facility at Fitzgerald Creek WPCP, including a new effluent pump station and modifications to existing buildings. The project requires labor, materials, and equipment for construction, site work, and electrical and instrumentation controls. Bidders must comply with Georgia laws and attend a mandatory pre-bid conference.
AvailablePurchase of various chemicals for the Yorktown Water Pollution Control Plant.
Posted Date
Nov 26, 2025
Due Date
Dec 30, 2025
Release: Nov 26, 2025
Close: Dec 30, 2025
Purchase of various chemicals for the Yorktown Water Pollution Control Plant.
AvailableDemolish existing filtration equipment, retrofit existing water treatment infrastructure, upgrade existing backwash pond, install owner-purchased low pressure membrane filtration system containers with supporting equipment and canopy structure, install raw water pump station upgrades, chemical storage and feed system, finished water pump station with curried clearwell, site grading, erosion control, civil site work and yard piping, stormwater improvements, electrical and instrumentation improvements, and install owner-purchased generator and switchboard.
Posted Date
Nov 17, 2025
Due Date
Jan 15, 2026
Release: Nov 17, 2025
Close: Jan 15, 2026
Demolish existing filtration equipment, retrofit existing water treatment infrastructure, upgrade existing backwash pond, install owner-purchased low pressure membrane filtration system containers with supporting equipment and canopy structure, install raw water pump station upgrades, chemical storage and feed system, finished water pump station with curried clearwell, site grading, erosion control, civil site work and yard piping, stormwater improvements, electrical and instrumentation improvements, and install owner-purchased generator and switchboard.
Design and construct water treatment plant process upgrades, including clarifiers, at the Ferncliff Water Treatment Plant.
Posted Date
Dec 10, 2025
Due Date
Jan 23, 2026
Release: Dec 10, 2025
Close: Jan 23, 2026
Design and construct water treatment plant process upgrades, including clarifiers, at the Ferncliff Water Treatment Plant.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis