CityFL
Posted
Nov 9, 2026
Dec 11, 2026
Description: Provide all labor, materials, and all incidentals necessary to assess, remove, and replace the existing bay doors.
City · FL, US
From the first pre-RFP signals to the published RFP and its files.
Annual financial report
395 days before RFP
The City recorded FS1 & FS2 Wind Retrofit as construction in progress with $571,280 in the General Fund and $167,417 in the Community Investment Tax Fund.
Construction in Progress Government Activities Project Number/ Code Fund Description In-Progress Amount PSBUIL General Fund Public Safety Building 25,397$ 24WIN General Fund FS1 & FS2 Wind Retrofit 571,280 EOCBLG General Fund Emergency Operations Center Bldg 456,641 Total general fund 1,053,318 23E127 Street Improvement 156,807 22MAYB Street Improvement…
City of Temple Terrace, Florida Annual Comprehensive Financial Report FY2025
Annual financial report · Sep 30, 2025
Meeting agenda
346 days before RFP
Temple Terrace staff proposed that the City Council approve continued HMGP administration for the Fire Stations No. 1 and No. 2 wind retrofits through project closeout, including efforts to secure funding for bay-door hardening.
Agenda Item: 11.C. Item Cover Page City Council Item Report Date: November 18, 2025 From: Brianne Holacik, Executive Assistant Item Type: Resolution - Agreement/Contract Subject: Resolution Approving a Change Order with Applied Sciences Consulting, Inc. for Continued Owner's Representative Services for the Wind Retrofit and HMGP Grant Administration at Fire…
Agenda packet
87 days before RFP
The City Council agenda proposed accepting revised HMGP funding and authorizing the required $122,764.90 local match for Fire Stations 1 and 2 wind-retrofit work including hurricane-rated apparatus bay replacement.
Recommendation: To approve a resolution accepting Modification No. 1 to Hazard Mitigation Grant Agreements DR-4486-012-R and DR-4486-099-R with the Florida Division of Emergency Management (FDEM), accepting revised grant funding for the Fire Station No. 1 and Fire Station No. 2 Wind Retrofit Projects, authorizing the required non-federal match, and…
RFP published
Proposals due (23 days left)
Adjacent opportunities open for bidding right now.
CityFL
Posted
Nov 9, 2026
Dec 11, 2026
City Council Agenda
Meeting agenda · Nov 18, 2025
City Council of Temple Terrace City Council Meeting
Agenda packet · Aug 4, 2026
FS 1 AND FS2 WIND RETROFIT IMPROVEMENTS Type Vendor Description GL Account Amount Revenue State of Florida Hazard Mitigation Grant Program (HMGP) 125-0000-332.00-00 $690,214 Revenue N/A CIT Fund Reserves 160-0000-389.10-00 $69,871 TOTAL REVENUE $760,085 Type Vendor Description GL Account Amount Expenditures TBD FS1 and FS2 Wind Retrofit Improvements…
Temple Terrace City Council City Council Meeting
Agenda packet · Aug 17, 2026
FS 1 AND FS2 WIND RETROFIT IMPROVEMENTS Type Vendor Description GL Account Amount Revenue State of Florida Hazard Mitigation Grant Program (HMGP) 125-0000-332.00-00 $690,214 Revenue N/A CIT Fund Reserves 160-0000-389.10-00 $69,871 TOTAL REVENUE $760,085 Type Vendor Description GL Account Amount Expenditures TBD FS1 and FS2 Wind Retrofit Improvements…
City of Temple Terrace FY2026 Budget Amendment (2026-08-17)
Budget amendment · Oct 1, 2025
ITB 26.27-3 consists of the construction of a 384 square foot safe room and wind retro-fit of the existing Fire House structure. The construction of the safe room is an ICF structure designed to ICC-500 specifications meeting a 200 MPH wind speed or greater impact resistance rating. Wind Retrofit of the existing firehouse is armoring windows and doors to provide maximum protection but is not designed to the ICC-500 rating system.
CityFL
Posted
Nov 9, 2026
Dec 11, 2026
ITB 26.27-3 consists of the construction of a 384 square foot safe room and wind retro-fit of the existing Fire House structure. The construction of the safe room is an ICF structure designed to ICC-500 specifications meeting a 200 MPH wind speed or greater impact resistance rating. Wind Retrofit of the existing firehouse is armoring windows and doors to provide maximum protection but is not designed to the ICC-500 rating system.
Special DistrictCA
Posted
Oct 26, 2026
Nov 24, 2026
Replace existing lighting systems with high-efficiency LED lighting and lighting controls.
Central Fire District Of Santa Cruz County
Special DistrictCA
Posted
-
Dec 18, 2026
Replacement of seven apparatus bay doors at Central Fire District Fire Stations 1 and 2, including removal and disposal of existing doors and associated components. The work includes supply and installation of heavy duty commercial steel rolling doors with 22-gauge steel curtain, steel bottom door, 100,000 high cycle springs, cast end lock, UHMW wear strips, approximately 4 feet of clear glass or plexiglass slats, 1 HP commercial openers with light curtains, wall control stations, remotes, exterior keypad on one door at each station, and automatic timers to close after 1–2 minutes. The project is being procured via CUPCCAA informal bidding (estimated $75,000–$220,000) and requires a California D-28 license, DIR registration, prevailing wage compliance, specified insurance, and performance/payment bonds where applicable.
Decision makers connected to this RFP from City of Temple Terrace.