Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Yakima County Fire Protection District 5
Fire station 5 addition.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Town of Zionsville
Work consists of 657 sf addition to existing fire station apparatus bay.
Posted Date
-
Due Date
Dec 16, 2025
Release: -
Town of Zionsville
Close: Dec 16, 2025
Work consists of 657 sf addition to existing fire station apparatus bay.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Cynthiana
Fire station #1 addition.
Posted Date
-
Due Date
Dec 2, 2025
Release: -
City of Cynthiana
Close: Dec 2, 2025
Fire station #1 addition.
AvailableCity of Mc Leansboro
Work includes fire station new addition
Posted Date
Nov 6, 2025
Due Date
Dec 11, 2025
Release: Nov 6, 2025
City of Mc Leansboro
Close: Dec 11, 2025
Work includes fire station new addition
AvailableTown of Boscawen
Construct two 22’x58’ additions to the existing fire station. Foundation: 4’ frost walls with 8” concrete slab. The additions will have 2”x6” wood frame walls with 10’8” ceiling height. New bearing walls (posts and beams) will be attached to the existing building (north and south walls) to support new roof trusses. The additions will have 22’ span mono pitch trusses, 3/12 pitch, framed to connect to the existing roof pitch. Interior will be finished with 5/8” sheetrock. Exterior siding and trim to match existing addition. Roofing: Metal or PVC. Roofing should include the entire main roof. Sprinkler system per NFPA Requirements.
Posted Date
Oct 21, 2025
Due Date
Dec 10, 2025
Release: Oct 21, 2025
Town of Boscawen
Close: Dec 10, 2025
Construct two 22’x58’ additions to the existing fire station. Foundation: 4’ frost walls with 8” concrete slab. The additions will have 2”x6” wood frame walls with 10’8” ceiling height. New bearing walls (posts and beams) will be attached to the existing building (north and south walls) to support new roof trusses. The additions will have 22’ span mono pitch trusses, 3/12 pitch, framed to connect to the existing roof pitch. Interior will be finished with 5/8” sheetrock. Exterior siding and trim to match existing addition. Roofing: Metal or PVC. Roofing should include the entire main roof. Sprinkler system per NFPA Requirements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →