Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of fire alarm system upgrades for Central Middle School and Margo Elementary School.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Elementary School Fire Alarm System Replacement.
Posted Date
-
Due Date
Jan 8, 2026
Close: Jan 8, 2026
Elementary School Fire Alarm System Replacement.
AvailableWork includes fire alarm upgrades.
Posted Date
Dec 3, 2025
Due Date
Jan 14, 2026
Release: Dec 3, 2025
Close: Jan 14, 2026
Work includes fire alarm upgrades.
AvailableThe Work consists of, but not limited to, the replacement of existing fire alarm systems with addressable fire alarm systems at the City of Sunrise Sawgrass Water and Wastewater Treatment Plant. The basic elements of the fire alarm system shall include, demolition of existing fire alarm systems, installation and integration of new addressable fire alarm system throughout the facility. This includes but is not limited to all general appurtenances, equipment, conduit, wiring, fiber optics, network devices, electrical systems, fire alarm control panels, fire alarm power supplies, signaling devices, notification appliances, engineering, site investigation, site restoration. The installation shall include but not be limited to: construction sequencing; engineering; signed and sealed fire alarm system shop drawings; performing an existing as-built investigation to document the existing fire alarm system and preparation of a final conduit plan based on schematic routing on the design plans and the results of the existing system investigation; preparing for installation of raceway; surface restoration of disturbed areas; installation of conductors and fiber optic through the conduit; completing all wiring and fiber connections to fire alarm panels and devices; fiber optic testing, building conduit penetrations, restoration and sealant; installation of fire alarm equipment and final wiring and fiber terminations, commissioning of the completed fire alarm systems to the satisfaction of the City.
Posted Date
Nov 12, 2025
Due Date
Dec 22, 2025
Release: Nov 12, 2025
Close: Dec 22, 2025
The Work consists of, but not limited to, the replacement of existing fire alarm systems with addressable fire alarm systems at the City of Sunrise Sawgrass Water and Wastewater Treatment Plant. The basic elements of the fire alarm system shall include, demolition of existing fire alarm systems, installation and integration of new addressable fire alarm system throughout the facility. This includes but is not limited to all general appurtenances, equipment, conduit, wiring, fiber optics, network devices, electrical systems, fire alarm control panels, fire alarm power supplies, signaling devices, notification appliances, engineering, site investigation, site restoration. The installation shall include but not be limited to: construction sequencing; engineering; signed and sealed fire alarm system shop drawings; performing an existing as-built investigation to document the existing fire alarm system and preparation of a final conduit plan based on schematic routing on the design plans and the results of the existing system investigation; preparing for installation of raceway; surface restoration of disturbed areas; installation of conductors and fiber optic through the conduit; completing all wiring and fiber connections to fire alarm panels and devices; fiber optic testing, building conduit penetrations, restoration and sealant; installation of fire alarm equipment and final wiring and fiber terminations, commissioning of the completed fire alarm systems to the satisfaction of the City.
AvailableProviding construction manager-at-risk services associated with upgrades to existing fire alarm system.
Posted Date
Nov 19, 2025
Due Date
Jan 7, 2026
Release: Nov 19, 2025
Close: Jan 7, 2026
Providing construction manager-at-risk services associated with upgrades to existing fire alarm system.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis