Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Work consists of, but not limited to, the replacement of existing fire alarm systems with addressable fire alarm systems at the City of Sunrise Sawgrass Water and Wastewater Treatment Plant. The basic elements of the fire alarm system shall include, demolition of existing fire alarm systems, installation and integration of new addressable fire alarm system throughout the facility. This includes but is not limited to all general appurtenances, equipment, conduit, wiring, fiber optics, network devices, electrical systems, fire alarm control panels, fire alarm power supplies, signaling devices, notification appliances, engineering, site investigation, site restoration. The installation shall include but not be limited to: construction sequencing; engineering; signed and sealed fire alarm system shop drawings; performing an existing as-built investigation to document the existing fire alarm system and preparation of a final conduit plan based on schematic routing on the design plans and the results of the existing system investigation; preparing for installation of raceway; surface restoration of disturbed areas; installation of conductors and fiber optic through the conduit; completing all wiring and fiber connections to fire alarm panels and devices; fiber optic testing, building conduit penetrations, restoration and sealant; installation of fire alarm equipment and final wiring and fiber terminations, commissioning of the completed fire alarm systems to the satisfaction of the City.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Design and construct water treatment plant process upgrades, including clarifiers, at the Ferncliff Water Treatment Plant.
Posted Date
Dec 10, 2025
Due Date
Jan 23, 2026
Release: Dec 10, 2025
Close: Jan 23, 2026
Design and construct water treatment plant process upgrades, including clarifiers, at the Ferncliff Water Treatment Plant.
AvailableImprovements to the Water Treatment Plant (WTP) for the Borough.
Posted Date
Nov 24, 2025
Due Date
Jan 27, 2026
Release: Nov 24, 2025
Close: Jan 27, 2026
Improvements to the Water Treatment Plant (WTP) for the Borough.
AvailableThe City of Loretto is soliciting separate sealed bids for the Loretto Water Treatment Plant Upgrades, including furnishing all materials, labor, tools, equipment, and appurtenances for the construction. Bids are due at 10:00 A.M. CST on December 18, 2025 at Loretto City Hall, 415 North Military Street, Loretto, TN 38469.
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
The City of Loretto is soliciting separate sealed bids for the Loretto Water Treatment Plant Upgrades, including furnishing all materials, labor, tools, equipment, and appurtenances for the construction. Bids are due at 10:00 A.M. CST on December 18, 2025 at Loretto City Hall, 415 North Military Street, Loretto, TN 38469.
AvailableDemolish existing filtration equipment, retrofit existing water treatment infrastructure, upgrade existing backwash pond, install owner-purchased low pressure membrane filtration system containers with supporting equipment and canopy structure, install raw water pump station upgrades, chemical storage and feed system, finished water pump station with curried clearwell, site grading, erosion control, civil site work and yard piping, stormwater improvements, electrical and instrumentation improvements, and install owner-purchased generator and switchboard.
Posted Date
Nov 17, 2025
Due Date
Jan 15, 2026
Release: Nov 17, 2025
Close: Jan 15, 2026
Demolish existing filtration equipment, retrofit existing water treatment infrastructure, upgrade existing backwash pond, install owner-purchased low pressure membrane filtration system containers with supporting equipment and canopy structure, install raw water pump station upgrades, chemical storage and feed system, finished water pump station with curried clearwell, site grading, erosion control, civil site work and yard piping, stormwater improvements, electrical and instrumentation improvements, and install owner-purchased generator and switchboard.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis