Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replace the existing faulty fire alarm control panel (FACP) and upgrade all obsolete fire alarm and sprinkler monitoring devices.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Upgrade existing fire alarm control panel (facp) digital alarm communication system from plain old telephone service (pots) copper landlines.
Posted Date
Jan 22, 2026
Due Date
Feb 5, 2026
Release: Jan 22, 2026
Close: Feb 5, 2026
Upgrade existing fire alarm control panel (facp) digital alarm communication system from plain old telephone service (pots) copper landlines.
AvailableRelease: Jan 8, 2026
Close: Jan 29, 2026
Access control system upgrade/replacement.
AvailableWork includes fire alarm system upgrade.
Posted Date
Jan 16, 2026
Due Date
Mar 6, 2026
Release: Jan 16, 2026
Close: Mar 6, 2026
Work includes fire alarm system upgrade.
AvailableWork includes roof deck infill for removed equipment; replacement of the existing schneider bas system with johnson controls metasys. Replacement of equipment controls components; replacement of the existing smoke exhaust fans with new fans sized per the rational analysis; demolition of the existing supply pressurization fans per the rational analysis; replacement of all life safety dampers;replacement of the existing fire alarm system, including the facp, end devices, relays, and wiring; supporting HVAC replacement.
Posted Date
Jan 5, 2026
Due Date
Feb 5, 2026
Release: Jan 5, 2026
Close: Feb 5, 2026
Work includes roof deck infill for removed equipment; replacement of the existing schneider bas system with johnson controls metasys. Replacement of equipment controls components; replacement of the existing smoke exhaust fans with new fans sized per the rational analysis; demolition of the existing supply pressurization fans per the rational analysis; replacement of all life safety dampers;replacement of the existing fire alarm system, including the facp, end devices, relays, and wiring; supporting HVAC replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →