Retrieving RFP details
Release
Close
City of Milwaukee
Final construction cleaning for single-family market-rate townhomes.
9923 ad notice REVISED
County of Placer
Parkway phase 1 - construction project.
Council Rock School District
Provide construction management services associated with Phase 2 of the High School South Stadium Renovations. Each project shall include the following services: Design Phase 1 - Programming and Schematic Design. Design Phase 2 - Design Development. Design Phase 3 - Construction Documents. Design Phase 4 - Bidding. Construction. Post-Construction Phase.
City of Crystal Lake
Phase 1: Installation/relocation of all impacted underground utilities (storm sewer, sanitary sewer, water main), installation of the far upstream and downstream reinforced concrete box culverts (RCBC) and headwalls, Soil Erosion/Sediment Control measures, and all necessary restoration. Phase 2: Installation of the remaining proposed reinforced concrete box culverts (RCBC) and headwalls, proposed creek grading and appurtenances for stabilization, Soil Erosion/Sediment Control measures, and all necessary restoration.
County of Placer
Provide professional engineering services for construction management, construction inspection, environmental services and materials testing, for the Placer Parkway Phase 1 Project.
Release
Sep 27, 2024
Close
Oct 08, 2024