Summary
Provide installation of infrastructure and fiber for the new agri building and classroom. Installation of new underground conduit; installation of new ground vaults; where new ground vaults are to be installed intersecting existing conduit, cut open the existing conduit to provide access while being careful not to damage existing active fiber; installation, labeling, termination, and certification of new singlemode fiber between designated locations; installation of tracesafe wiring to be run in any conduit that does not already have tracesafe. Termination of tracesafe should be done in each ground vault/handhold; creation of as-built documentation and maps of the new conduit routes, spliceboxes, and ground vaults/handholds. Documentation and maps must be provided to atu at project completion.