CityOH
Posted
Oct 15, 2026
Dec 1, 2026
WWTP Replacement Project RFP
Project consists of wastewater treatment plant replacement work.
Description: Work consists of excavations, back-fill, back-fill materials, compaction, pavement removal, disposal of waste material at contractor’s site, locating, protecting, and/or rerouting existing utilities and services, base and top course, paving, trenching, imported backfill, pipe bedding, cleaning, testing, surface restoration and landscaping.
City · WA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityOH
Posted
Oct 15, 2026
Dec 1, 2026
Project consists of wastewater treatment plant replacement work.
CityRI
Posted
Oct 9, 2026
Nov 6, 2026
Stand-by Generator Replacement - WWTP.
CityMI
Posted
-
Nov 10, 2026
Works include approx. 1,500 LF of Provide Erosion Control, Silt Fence Around the Retention Basin; 15,000 SY Remove and Dispose of Existing Retention Basin Liner; 3,500 SY Provide Necessary Repairs to Asphalt Surface, Cracks, Holes, etc.; 15,000 SY nstall New Black, 60 mil Agru MicroSpike Liner, or Approved Equal, Textured HDPE Geomembrane Liner.
CityNJ
Posted
Sep 29, 2026
Nov 5, 2026
Installation of a new 350 kW indoor diesel generator, 800A ATS, 800A portable generator connection panel, day tank, 500-gal. outdoor above ground diesel fuel tank (AST), fuel transfer pump system, fuel piping, louvers and associated ducts, conduits, wires.