FederalTX
Posted
Aug 26, 2026
Oct 21, 2026
FCI Elkton - Upgrade Fire Pump
Upgrade fire pump. Upgrade of the institution's diesel fire pump control system.
Description: The Federal Bureau of Prisons, Federal Correctional Institution (FCI) Elkton, is soliciting a firm-fixed-price construction contract to upgrade the fire pump at its facility in Lisbon, Ohio. The work includes replacing the existing diesel fire pump controller and associated components, installing new conduit and communication lines, reconnecting control circuits and sensors, integrating the system with facility automation platforms, and performing testing and commissioning. This is a 100 percent small-business set-aside contract opportunity, and quotes are to be evaluated on price, technical capability, and past performance.
Federal · TX, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Adjacent opportunities open for bidding right now.
FederalTX
Posted
Aug 26, 2026
Oct 21, 2026
Upgrade fire pump. Upgrade of the institution's diesel fire pump control system.
FederalTX
Posted
-
Oct 13, 2026
The Federal Bureau of Prisons is soliciting a firm-fixed-price construction contractor to rehabilitate and modernize the water storage and distribution system at FCI Texarkana in Texas. The work includes rehabilitation of a 1-million-gallon ground tank and a 150,000-gallon elevated tower, replacement of pumps, piping, valves, and control panels, installation of an air-gapped analog monitoring system, testing, certification, and a five-year warranty. The active construction solicitation has an offer deadline of October 13, 2026, and is not a grant program.
FederalTX
Posted
-
Oct 13, 2026
The Federal Bureau of Prisons is soliciting a firm-fixed-price construction contractor to rehabilitate and modernize the water storage and distribution system at FCI Texarkana in Texas. The work includes rehabilitation of a 1-million-gallon ground tank and a 150,000-gallon elevated tower, replacement of pumps, piping, valves, and control panels, installation of an air-gapped analog monitoring system, testing, certification, and a five-year warranty. The active construction solicitation has an offer deadline of October 13, 2026, and is not a grant program.
Posted
Sep 12, 2026
Sep 23, 2026
The U.S. Army Corps of Engineers Headquarters is soliciting a total small-business-set-aside requirement to replace existing fire alarm systems across multiple facilities. The procurement will use Simplified Acquisition Procedures and requires a site visit at Kingman Building 2593 on September 16, 2026; attendance is mandatory. Offers are due September 23, 2026, at 6:00 PM EDT, and the notice is scheduled to become inactive on October 8, 2026.
Decision makers connected to this RFP from FAO.