Summary
Project scope shall include approx. 210 LF of 30" RCP storm sewer; and 690 SY of 8"-10" reinforced concrete pavement. 210 LF furnish and install 30" RCP, C-76 CL III culvert storm sewer with standard bedding and backfill (complete in place); 4 EA 30" storm safety end treatment (complete in place); 101 LF remove and dispose existing 30" RCP storm sewer culvert (complete in place); 8 EA remove and dispose existing 30" storm safety end treatment (complete in place); 2 EA txdot "AZ" inlet (per txdot detail)(furnish and install, complete in place); 252 LF regrade existing drainage ditch to proposed flow lines (complete in place); 608 LF existing drainage ditch to be cleaned, demucked and filled (complete in place). See attached file.