Fayette County
Provide county airport aeronautics economic development fund hangar.
Beatrice Airport Authority
Site preparation/mobilization and temporary airport safety measures; Erosion control measures; Removal of existing pavement; Earthwork (excavation, embankment, off-site borrow); Construction of new aggregate base course; Construction of new concrete pavement; Airfield Pavement Marking; Installation of storm sewer system; Topsoil, seeding, and mulching; Installation of new hangar electric service power cabling in conduit; Construction of new 10-Place Nested T-Hangar (231’ Long x 51’ Wide, With 41’-6” x 12’ Clear Opening Bi-Fold Doors).
City of Los Angeles
Prepare an economic study related to the development of the specific plan (specific plan).
City of McKinney
Work includes replace the current fire protection system at airport corporate 3 hangar. Provide a completely new network intelligent analog addressable fire alarm system for the corporate hangar 3. Provide new initiating and notification appliances as required by currently adopted building codes for a complete, approved system in accordance with the city. The new fire alarm system will include but not be limited to: control equipment, notification appliances, notification power expanders, addressable modules, , spot-type photo smoke and heat detection, temperature sensors, manual pull stations, strobe units, duct detectors, and miscellaneous connections such as sprinkler valve supervisory switches, pressure switches, water flow switches, elevator recall/shunt trip operation, 120-volt electrical power and connections, auxiliary relays, air handler unit shutdown, damper control, and access control systems, the release of door locks, etc. See attached files.
Release
Oct 15, 2025
Close
Nov 06, 2025