Work includes, in general, the furnishing of labor, materials, and equipment for the construction of new sanitary sewer lines in the City, including, but not limited to replacing existing sewer pipes with approx. 10,837 LF of new pipes by open cut; approx. 4,236 LF new pipes by pipe bursting; and rehabilitating approx. 9,668 LF of existing pipes by cured in place pipe (CIPP); restoring and reconnecting all affected sanitary sewer service lines (laterals); installing new, abandoning, modifying, and replacing sewer manholes. The work also includes cleaning and video inspection of sanitary sewer pipes, wastewater flow control and bypass pumping, dewatering, shoring, traffic control, utility locating, potholing, public notification, restoration of public and private surface improvements (including but not limited to pavement, sidewalk, curb and gutter, fences, and landscaping), and all incidental items not mentioned above, but are required by the Contract Drawings, Standard Specifications, Technical Specifications, or these Special Provisions.
Available