Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Alabama Department of Veterans Affairs is soliciting a contractor to replace a 400-amp breaker and associated switchgear in the mechanical room at the Floyd E. ‘Tut’ Fann State Veterans Home in Huntsville, AL. The work supports the facility’s main power distribution and is to be performed outside kitchen operating hours to minimize disruption. Contractors will be responsible for coordination, safety, and any necessary power shutdowns to complete the replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The State Government of Alabama is seeking proposals for the replacement of breakers at Fann Home. This solicitation, identified as SRC0000032336, was posted on December 8, 2025. Bids are due by December 15, 2025.
Posted Date
Dec 8, 2025
Due Date
Dec 15, 2025
Release: Dec 8, 2025
Close: Dec 15, 2025
The State Government of Alabama is seeking proposals for the replacement of breakers at Fann Home. This solicitation, identified as SRC0000032336, was posted on December 8, 2025. Bids are due by December 15, 2025.
AvailablePremium
Access the largest public sector contact database
Work includes replace 400-amp breaker and switch gear that is located the mechanical room for main power distribution throughout the facility.
Posted Date
Dec 8, 2025
Due Date
Dec 15, 2025
Release: Dec 8, 2025
Close: Dec 15, 2025
Work includes replace 400-amp breaker and switch gear that is located the mechanical room for main power distribution throughout the facility.
AvailableWork includes to replace the existing 2. 5 ton trane water source heat pump system with new or like kind, disconnect electrical, controls and drain lines, disconnect the supply and return water lines and drain the system, disconnect duct work from existing system, remove and dispose of old system and miscellaneous duct materials, 2. 5-ton water source heat pump system 460volts 3phase, fabricated transitions to connect the existing supply duct system, fabricate auxiliary drain pan with safety switch, modified and reconnect supply / return water lines including drain line.
Posted Date
Dec 10, 2025
Due Date
Dec 16, 2025
Release: Dec 10, 2025
Close: Dec 16, 2025
Work includes to replace the existing 2. 5 ton trane water source heat pump system with new or like kind, disconnect electrical, controls and drain lines, disconnect the supply and return water lines and drain the system, disconnect duct work from existing system, remove and dispose of old system and miscellaneous duct materials, 2. 5-ton water source heat pump system 460volts 3phase, fabricated transitions to connect the existing supply duct system, fabricate auxiliary drain pan with safety switch, modified and reconnect supply / return water lines including drain line.
AvailableThe City of West Sacramento is seeking sealed bids to replace the Actiflo ATS breaker and controller and to replace and test a 12 kV breaker in accordance with the project specifications. Instructions for bidding, responsiveness standards, and detailed specifications are provided in the attached bid packet and related documents.
Posted Date
Nov 15, 2025
Due Date
Dec 19, 2025
Release: Nov 15, 2025
Close: Dec 19, 2025
The City of West Sacramento is seeking sealed bids to replace the Actiflo ATS breaker and controller and to replace and test a 12 kV breaker in accordance with the project specifications. Instructions for bidding, responsiveness standards, and detailed specifications are provided in the attached bid packet and related documents.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis