Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of West Sacramento is seeking sealed bids to replace the Actiflo ATS breaker and controller and to replace and test a 12 kV breaker in accordance with the project specifications. Instructions for bidding, responsiveness standards, and detailed specifications are provided in the attached bid packet and related documents.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of West Sacramento is seeking sealed bids to replace the Actiflo ATS breaker and controller and to replace and test a 12 kV breaker in accordance with the project specifications. Instructions for bidding, responsiveness standards, and detailed specifications are provided in the attached bid packet and related documents.
Posted Date
Nov 15, 2025
Due Date
Dec 19, 2025
Release: Nov 15, 2025
Close: Dec 19, 2025
The City of West Sacramento is seeking sealed bids to replace the Actiflo ATS breaker and controller and to replace and test a 12 kV breaker in accordance with the project specifications. Instructions for bidding, responsiveness standards, and detailed specifications are provided in the attached bid packet and related documents.
Premium
Access the largest public sector contact database
Work includes replace 400-amp breaker and switch gear that is located the mechanical room for main power distribution throughout the facility.
Posted Date
Dec 8, 2025
Due Date
Dec 15, 2025
Release: Dec 8, 2025
Close: Dec 15, 2025
Work includes replace 400-amp breaker and switch gear that is located the mechanical room for main power distribution throughout the facility.
AvailableThe Alabama Department of Veterans Affairs is soliciting a contractor to replace a 400-amp breaker and associated switchgear in the mechanical room at the Floyd E. ‘Tut’ Fann State Veterans Home in Huntsville, AL. The work supports the facility’s main power distribution and is to be performed outside kitchen operating hours to minimize disruption. Contractors will be responsible for coordination, safety, and any necessary power shutdowns to complete the replacement.
Posted Date
Dec 9, 2025
Due Date
Dec 15, 2025
Release: Dec 9, 2025
Close: Dec 15, 2025
The Alabama Department of Veterans Affairs is soliciting a contractor to replace a 400-amp breaker and associated switchgear in the mechanical room at the Floyd E. ‘Tut’ Fann State Veterans Home in Huntsville, AL. The work supports the facility’s main power distribution and is to be performed outside kitchen operating hours to minimize disruption. Contractors will be responsible for coordination, safety, and any necessary power shutdowns to complete the replacement.
AvailableThe project consists of a replacement of the fire pump controller in the basement of the UAB Spain Wallace facility. The scope of work includes electrical demolition and new work, as well as associated architectural and mechanical modifications as required to facilitate the equipment replacement.
Posted Date
Dec 3, 2025
Due Date
Jan 22, 2026
Release: Dec 3, 2025
Close: Jan 22, 2026
The project consists of a replacement of the fire pump controller in the basement of the UAB Spain Wallace facility. The scope of work includes electrical demolition and new work, as well as associated architectural and mechanical modifications as required to facilitate the equipment replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis