Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Soliciting bids for the construction of a new sewage lift station, including a pump station, gravity sewer lines, force main, existing sewer infrastructure upgrades, and requisite site work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Procurement of lift station upgrades at the Bucks Rd Lift Station, including demolition of the existing station, installation of new panels, pumps, and electrical systems, and lining of the existing wet well.
Posted Date
Dec 2, 2025
Due Date
Jan 21, 2026
Release: Dec 2, 2025
Close: Jan 21, 2026
Procurement of lift station upgrades at the Bucks Rd Lift Station, including demolition of the existing station, installation of new panels, pumps, and electrical systems, and lining of the existing wet well.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes the installation of a lift station and force main
Posted Date
-
Due Date
Jan 15, 2026
Close: Jan 15, 2026
Project includes the installation of a lift station and force main
Available2 EA of Pumps, Lift Station-60P; Parts Lift Station-60P; Spare Parts, Lift Station-60P; Startup Services, Lift Station-60P; Control Panel, Lift Station -60P. 2 EA of Pumps, Lift Station-62P; Parts Lift Station-62P; Spare Parts, Lift Station-62P; Startup Services, Lift Station-62P; Control Panel, Lift Station -62P.
Posted Date
Jan 4, 2026
Due Date
Feb 5, 2026
Release: Jan 4, 2026
Close: Feb 5, 2026
2 EA of Pumps, Lift Station-60P; Parts Lift Station-60P; Spare Parts, Lift Station-60P; Startup Services, Lift Station-60P; Control Panel, Lift Station -60P. 2 EA of Pumps, Lift Station-62P; Parts Lift Station-62P; Spare Parts, Lift Station-62P; Startup Services, Lift Station-62P; Control Panel, Lift Station -62P.
AvailableImprovements to lift station. This station is a three-pump (triplex) submersible sewage pumping station. To replace aging infrastructure and upsize the lift station capacity, a new wetwell complete with pump station components will be installed at the site of the existing pump station next to the existing equipment. The following major components will be installed: pour-in-place concrete wetwell and valve pad, three submersible pumps, guide rails, access hatches, station piping, electrical panel and controls, sanitary sewer manholes, fencing, new gab site pad. Existing equipment will be relied upon for lift station operation during construction. Following turnover to new equipment, existing structures will be abandoned in place, and pipes will be cut, capped, and abandoned in place where indicated on the plans. Contractor will also make the appropriate connections and disconnections to and from the existing and proposed system. Bypass pumping will be required to make tie-ins to the existing force main.
Posted Date
Dec 4, 2025
Due Date
Feb 25, 2026
Release: Dec 4, 2025
Close: Feb 25, 2026
Improvements to lift station. This station is a three-pump (triplex) submersible sewage pumping station. To replace aging infrastructure and upsize the lift station capacity, a new wetwell complete with pump station components will be installed at the site of the existing pump station next to the existing equipment. The following major components will be installed: pour-in-place concrete wetwell and valve pad, three submersible pumps, guide rails, access hatches, station piping, electrical panel and controls, sanitary sewer manholes, fencing, new gab site pad. Existing equipment will be relied upon for lift station operation during construction. Following turnover to new equipment, existing structures will be abandoned in place, and pipes will be cut, capped, and abandoned in place where indicated on the plans. Contractor will also make the appropriate connections and disconnections to and from the existing and proposed system. Bypass pumping will be required to make tie-ins to the existing force main.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →