Summary
The work at the National Guard Armory shall include the complete rebuild of the damaged sustained from an explosion and fire. This project is to include repairs to the common wall on the drill hall floor, the complete rebuild of the boiler including replacement of the HVAC system and boilers, rebuilding walls, roofs and ceilings, and all systems damaged by the accident. The work at the alaska army national guard armory shall include the full rebuilding of the damaged structure to pre-explosion and fire damage condition. This project to include repairs to the common wall on the drill hall floor, boiler room (room 141), office storage room (room 140), 297th mp room (room 138b) and fsc hhc room (room 138a). This project requires redesign and installation of the hvac system including but not limited to; two boiler multi-fuel boilers (natural gas and diesel), ddc system, day tank, unit heater, electrical panels, supply and return pumps, service lines, lighting, exterior double doors, walls, ceilings, roofs, natural gas line repositioning, bollard installation, fire alarm and fire suppression replacement in the damaged area.