Summary
Work includes 1 LS of mobilization; 2 EA of remove tree; 421 CY of roadway excavation; 456 CY of loose riprap; 324 FT of remove water pipe; 36 CY of granular backfill borrow (plan quantity); 1 EA of remove bridge; 1 ls of structural concrete; 1,479 SF of bridge deck methacrylate resin treatment; 1 LS of structural steel; 1 LS of electrical conduit on bridge; 1,381 SF of bridge groove texturing; 8 FT of chain link fence on structure; 1 LS of temporary retaining wall; 123 SY of strip and stockpile salvaged topsoil (plan quantity); 123 SY of spread salvaged topsoil (plan quantity); etc, see attached file.