Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking qualified professional consultant to work with the city to conduct on-site exterior building condition assessments of properties.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Seeking to establish contracts with one or more companies that can provide Facility Condition Assessments (FCA) across a broad spectrum of buildings, including buildings such as state offices, correctional facilities, housing, welcome and information centers, state police barracks, libraries, courthouses, the State House, laboratories, historic sites, and Vermont Veterans’ Home. Some buildings have tunnels, both confined and walkable. Contract values will vary depending on the number of firms hired and each firm’s scope of work. The State has completed two rounds of FCA’s on a 5 year cycle each and has begun moving FCA asset data from the latest round into an integrated workplace management system which will be the source of existing asset data for this round of FCA’s. Previous FCA reports will be made available to the contracted firm via a SharePoint site in PDF format and FCA asset and property data will be made available in either .csv or xlsx format.
Posted Date
Jan 5, 2026
Due Date
Feb 3, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 3, 2026
Seeking to establish contracts with one or more companies that can provide Facility Condition Assessments (FCA) across a broad spectrum of buildings, including buildings such as state offices, correctional facilities, housing, welcome and information centers, state police barracks, libraries, courthouses, the State House, laboratories, historic sites, and Vermont Veterans’ Home. Some buildings have tunnels, both confined and walkable. Contract values will vary depending on the number of firms hired and each firm’s scope of work. The State has completed two rounds of FCA’s on a 5 year cycle each and has begun moving FCA asset data from the latest round into an integrated workplace management system which will be the source of existing asset data for this round of FCA’s. Previous FCA reports will be made available to the contracted firm via a SharePoint site in PDF format and FCA asset and property data will be made available in either .csv or xlsx format.
AvailableProvide architectural/civil engineering services to design for determining repairs needed for exterior buildings that were identified in the study for repair building exterior.
Posted Date
Jan 20, 2026
Due Date
Feb 19, 2026
Release: Jan 20, 2026
Close: Feb 19, 2026
Provide architectural/civil engineering services to design for determining repairs needed for exterior buildings that were identified in the study for repair building exterior.
AvailableProvide renovation of warehouse exterior storage building.
Posted Date
Jun 14, 2025
Due Date
Feb 5, 2026
Release: Jun 14, 2025
Close: Feb 5, 2026
Provide renovation of warehouse exterior storage building.
AvailableDesign, fabricate, and install new exterior building signage to replace individually mounted, vacuum-formed plastic letters and numbers with a new signage system that reflects a more contemporary aesthetic, utilizes higher-quality and longer-lasting materials, and supports consistent application across multiple locations.
Posted Date
Dec 8, 2025
Due Date
Jan 29, 2026
Release: Dec 8, 2025
Close: Jan 29, 2026
Design, fabricate, and install new exterior building signage to replace individually mounted, vacuum-formed plastic letters and numbers with a new signage system that reflects a more contemporary aesthetic, utilizes higher-quality and longer-lasting materials, and supports consistent application across multiple locations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →