Retrieving RFP details
Release
Close
Township of Exeter
Scope of work generally includes traffic signal improvements i.e., traffic signal controller assemblies, traffic signal vehicular signals, signal cabling, controller timing adjustments, and other construction elements associated with traffic signals. Work includes 1 LS of mobilization; 4 EA of controller modification, controller upgrade, econolite cobalt; 36 LF of backplate retrofit; 3 LF of video detection system; 2 EA of radar detection system, two approaches; 1 EA of radar detection system, one approach.
Exeter Township Traffic Signal Upgrades Project
zip
Borough of West Reading
Traffic signal improvements i.e., traffic signal controller assemblies, traffic signal vehicular signals, signal cabling, controller timing adjustments, and other construction elements associated with traffic signals.
Massachusetts Bay Transportation Authority
Project includes Broad St. Traffic Signal Upgrades.
City of Yucaipa
Project consists of furnishing and installing traffic signal heads throughout the city with new safety enhancements, such as backplates featuring retroreflective tape and air vents. See outside link.
Release
Oct 13, 2025
Close
Nov 12, 2025