CityIA
Posted
Sep 9, 2026
Sep 30, 2026
Lincolnway Village Intake Replacements
Work includes approx 225 LF of 12" RCP, storm sewer, trenched; 2 EA fire hydrant assembly; 4 EA connection to existing manhole; 1,134.8 SY full depth patches, pcc; 4 EA intake, SW-509.
