Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
952 SY concrete curb and gutter subbase removal, variable thickness (N.S); 95 CY excavation, test pits (If and where directed); 952 SY concrete curb and gutter subbase removal, variable thickkness (N.S); 1,235 SY dense-graded aggregate base course, 6" thick (if and where needed); 219 ballast stone, 3/4'-1 1/2" (if and where neened)(N.S); 12,164 SY HMA milling, less than 3" thick (N.S); 17,501 SY HMA milling, 3" thickk or greater (N.S); 3,905 ton hot mix asphalt surface course, 12.5M64, 2" thick; 7,004 ton hot mix asphalt base course, 19M64, 6" thick; 2,105 Modular block retaining wall (N.S); 53 LF of 15" reinforced concrete pipe (If and where directed); 653 LF of 18" reinforced concrete pipe (if and where directed); 15 LF of 12" PVC sewer pipe; 205 LF of 10" ductile iron pipe. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project is generally described as construction of the extension of road and sidewalk improvements.
Posted Date
Dec 2, 2025
Due Date
Jan 8, 2026
Release: Dec 2, 2025
Close: Jan 8, 2026
Project is generally described as construction of the extension of road and sidewalk improvements.
AvailableThe City of Thousand Oaks Public Works - Engineering Division is soliciting professional engineering and design services for the Route 23/Olsen Road Bike Improvements Project (CI 5724), including preliminary engineering, environmental documents, right-of-way services, utility coordination, PS&E development, and design-phase construction support. The project will improve bicyclist safety within ~1,500 linear feet at the SR-23 undercrossing by installing new bike lane striping, modifying traffic signal phasing for bikes, and designing improvements in accordance with Caltrans standards. The solicitation is an open Request for Proposals/Qualifications (not a grant) with proposals due January 16, 2026; the posting and timeline are published on the City of Thousand Oaks procurement portal.
Posted Date
Dec 5, 2025
Due Date
Jan 17, 2026
Release: Dec 5, 2025
Close: Jan 17, 2026
The City of Thousand Oaks Public Works - Engineering Division is soliciting professional engineering and design services for the Route 23/Olsen Road Bike Improvements Project (CI 5724), including preliminary engineering, environmental documents, right-of-way services, utility coordination, PS&E development, and design-phase construction support. The project will improve bicyclist safety within ~1,500 linear feet at the SR-23 undercrossing by installing new bike lane striping, modifying traffic signal phasing for bikes, and designing improvements in accordance with Caltrans standards. The solicitation is an open Request for Proposals/Qualifications (not a grant) with proposals due January 16, 2026; the posting and timeline are published on the City of Thousand Oaks procurement portal.
This project covers the installation of a traffic signal and other improvements at the intersection of Forestville Road.
Posted Date
Nov 6, 2025
Due Date
Dec 17, 2025
Release: Nov 6, 2025
Close: Dec 17, 2025
This project covers the installation of a traffic signal and other improvements at the intersection of Forestville Road.
AvailableThe Project includes the following Work: Onion River Road, Bridge 27 – Install temporary bypass road, remove temporary bridge, demolish old bridge, installation of new bridge (95’ clear span, NEDBT40 precast superstructure on integral abutments supported by driven h-piles), rock armoring, roadway construction and associated work. Sass Ave, Bridge 17 – Demolish old bridge, installation of new bridge (75’ clear span, NEXT36D precast superstructure on integral abutments supported by driven h-piles), rock armoring, roadway construction, remove temporary bridge, and associated work.
Posted Date
Nov 12, 2025
Due Date
Dec 19, 2025
Release: Nov 12, 2025
Close: Dec 19, 2025
The Project includes the following Work: Onion River Road, Bridge 27 – Install temporary bypass road, remove temporary bridge, demolish old bridge, installation of new bridge (95’ clear span, NEDBT40 precast superstructure on integral abutments supported by driven h-piles), rock armoring, roadway construction and associated work. Sass Ave, Bridge 17 – Demolish old bridge, installation of new bridge (75’ clear span, NEXT36D precast superstructure on integral abutments supported by driven h-piles), rock armoring, roadway construction, remove temporary bridge, and associated work.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis