Columbia County School District
School DistrictGA
Posted
-
Oct 30, 2026
TC-10-30-26A - Annual Chiller Services for Evans High School, Harlem High School and Lakeside High School RFP
Annual chiller services for schools.
Description: Columbia County School District is soliciting bids for the Evans High School turf project under solicitation TC-12-03-26A. The district lists it with current construction and maintenance projects, and its capital-program page identifies high-school turf-field and track improvements. The Georgia Procurement Registry marks the event open, with bids due December 3, 2026.
SchoolDistrict · GA, US
From the first pre-RFP signals to the published RFP and its files.
Board meeting
The Board discussed a possible Evans High School practice-field renovation to address holes and variations in the turf.
there is the possibility and the desire to perhaps put the tennis courts across the street from the high school and then that would open up that um practice field in the back for more practice space for our schools to utilize especially in the spring that becomes very helpful for them to utilize. So, just to kind of revisit some of our athletic upgrades at…
Board of Education Regular Session
Board meeting · Jun 10, 2025
Board meeting
District staff proposed developing a fenced, multipurpose practice field at Evans High School, subject to further engineering and a later recommendation.
>> and Harlem High School. Um >> real quick, Dr. Flint, sorry. Before we move on from Heaven Evans, what's the latest for what we're using that land across the road for? Is that still tennis courts? >> No. Uh, tennis courts are actually going to be, if you look out these windows in the original plan, uh, this is where they were located. You can almost see…
Board meeting
The FY27 planning discussion projected $55 million in ESPLOST revenue and approximately $50 million needed for the Lakeside and Evans projects.
$9 million. We anticipate receiving 55 million in east loss revenue throughout FY27. That's that number on top. 47 million plus 8 million. Um, without the Harland High School bond proceeds, this would have left us to a total of $64 million in funding for the building program for the fiscal year 27, which we're looking at here. About 18 million of that would…
Columbia County School District Board Regular Session Board Meeting
Board meeting · May 12, 2026
RFP published
Proposals due (36 days left)
Columbia County Board of Education Regular Session Board Meeting
Board meeting · Apr 21, 2026
Decision makers connected to this RFP from Columbia County School District.
Adjacent opportunities open for bidding right now.
Columbia County School District
School DistrictGA
Posted
-
Oct 30, 2026
Annual chiller services for schools.
Columbia County School District
School DistrictGA
Posted
Oct 15, 2026
Nov 2, 2026
True Refrigeration-Model No. TMC-34-S-HC or Approved Equal Mobile Milk Cooler, forced‐air, (8) 13" x 13" x 11‐1/8" crate capacity, stainless steel drop front/hold‐open flip‐up lid with lock, 33 - 38°F temperature range, (2) heavy‐duty floor racks, digital thermometer, all stainless‐steel exterior, clear coated aluminum lined interior with reinforced stainless‐steel floor, 4" casters, R290 Hydrocarbon refrigerant, 1/5 HP, 115v/60/1‐ph, 2.7 amps, NEMA 5‐15P, cULus, UL EPH Classified, Made in USA, ENERGY STAR.
CityFL
Posted
Oct 21, 2026
Nov 3, 2026
Seeking quotes for turf / lawn treatment and turf pest control services for eleven (11) property locations. See attached file.
CountyMT
Posted
Oct 9, 2026
Oct 29, 2026
Project consists of repair of a road slide, including 10' of excavation of poorly compacted road subgrade, reconstruction with structural fill and geogrid, surfacing gravel, magnesium chloride treatment, slope regrading and revegetation with geoweb stabilization, and other miscellaneous work; erosion control; unclassified excavation; 2,580 CY of crushed gravel base course; 880 SY of mdt type a, grade 2 surfacing; 705 SY of geotextile separation fabric; 115 CY of drain rock; 340 LF of 6" HDPE storm pipe; 980 SY of regrade and revegetate slope (geocell panels); ditch & drainage improvements; 14 SY of class 1 riprap.