Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
New control building. New watermain pipe. Completion of seven (7) wells with pitless adapter and submersible turbine pumps.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procure estimated costs for drilling contracting services. Bid proposal is to replace two type 1 wells (well #9 & well #10).
Posted Date
Dec 29, 2025
Due Date
Jan 26, 2026
Release: Dec 29, 2025
Close: Jan 26, 2026
Procure estimated costs for drilling contracting services. Bid proposal is to replace two type 1 wells (well #9 & well #10).
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project includes approx. the construct 14 new domestic wells, install PE water service lines, complete electrical appurtenances, and accompanying constant pressure systems. Abandon existing wells when applicable (8). Investigate 1 domestic well and rehabilitate. Abandon 4 existing wells, including 1 flowing well and 1 chamber well. All work shall be done in accordance with the Technical Provisions and drawings attached. See outside link for more details. All drilling activities must take place outside of May 1st-August 15th. Tree removal can only take place with written pre-authorization from the engineer.
Posted Date
Jan 7, 2026
Due Date
Jan 30, 2026
Release: Jan 7, 2026
Close: Jan 30, 2026
The project includes approx. the construct 14 new domestic wells, install PE water service lines, complete electrical appurtenances, and accompanying constant pressure systems. Abandon existing wells when applicable (8). Investigate 1 domestic well and rehabilitate. Abandon 4 existing wells, including 1 flowing well and 1 chamber well. All work shall be done in accordance with the Technical Provisions and drawings attached. See outside link for more details. All drilling activities must take place outside of May 1st-August 15th. Tree removal can only take place with written pre-authorization from the engineer.
AvailableThe Township of Stafford (NJ) is soliciting bids to decommission Wells 1 & 2 and perform upgrades to Well No. 12, with work to be conducted at the Township well sites. All solicitation documents (Notice to Bidders, Instructions to Bidders, Technical Specifications, Bid Plans, and required compliance forms) are posted on Stafford Township's Bonfire opportunity and submissions are made via the Bonfire portal. This is an open RFB (not a grant), posted 2026-01-08 and closing 2026-01-27; a voluntary pre-bid meeting is scheduled for 2026-01-14 and questions are due 2026-01-22.
Posted Date
Jan 8, 2026
Due Date
Jan 27, 2026
Release: Jan 8, 2026
Close: Jan 27, 2026
The Township of Stafford (NJ) is soliciting bids to decommission Wells 1 & 2 and perform upgrades to Well No. 12, with work to be conducted at the Township well sites. All solicitation documents (Notice to Bidders, Instructions to Bidders, Technical Specifications, Bid Plans, and required compliance forms) are posted on Stafford Township's Bonfire opportunity and submissions are made via the Bonfire portal. This is an open RFB (not a grant), posted 2026-01-08 and closing 2026-01-27; a voluntary pre-bid meeting is scheduled for 2026-01-14 and questions are due 2026-01-22.
AvailableWork consists of removal an rehabilitation of existing well pump and motor; installation of rehabilitated well pump and motor; removal and replacement of level transducers and tubing, and adding 2nd tube; video inspection of well; rehabilitation of well by brushing and bailing of debris, as needed; furnishing new equipment instead of rehabilitated. Also Includes 430 EA AWG #3/0 wire with ground; 19 EA column pipe 10"x10", T & C
Posted Date
Jan 22, 2026
Due Date
Feb 19, 2026
Release: Jan 22, 2026
Close: Feb 19, 2026
Work consists of removal an rehabilitation of existing well pump and motor; installation of rehabilitated well pump and motor; removal and replacement of level transducers and tubing, and adding 2nd tube; video inspection of well; rehabilitation of well by brushing and bailing of debris, as needed; furnishing new equipment instead of rehabilitated. Also Includes 430 EA AWG #3/0 wire with ground; 19 EA column pipe 10"x10", T & C
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →