Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Town of Nashville, North Carolina is soliciting sealed bids for the Essex Road Sewer Extension Improvements, funded in part under NC DEQ’s CWSRF program (Grant/Project CS370554-01). The work includes installing approximately 1,709 LF of 8‑inch PVC gravity sanitary sewer, 10 precast manholes, 23 4‑inch services with cleanouts, associated bedding, backfill, and roadway/driveway cuts and repairs. A recommended pre‑bid is scheduled for January 13, 2026, and bids are due January 22, 2026 at 2:00 PM Eastern time.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of 8" PVC sanitary sewer and appurtenances.
Posted Date
Dec 22, 2025
Due Date
Jan 23, 2026
Release: Dec 22, 2025
Close: Jan 23, 2026
Construction of 8" PVC sanitary sewer and appurtenances.
AvailableThe project generally includes installation of approx. 11,400 feet of 8” and 16” PVC waterline and 10,300 feet of 12” PVC sanitary sewer along Summit Road and Morse Road in Licking County, Ohio. The project includes waterline and sanitary sewer piping installation via horizontal directional drilling and jack and bore methods.
Posted Date
Jan 2, 2026
Due Date
Feb 5, 2026
Release: Jan 2, 2026
Close: Feb 5, 2026
The project generally includes installation of approx. 11,400 feet of 8” and 16” PVC waterline and 10,300 feet of 12” PVC sanitary sewer along Summit Road and Morse Road in Licking County, Ohio. The project includes waterline and sanitary sewer piping installation via horizontal directional drilling and jack and bore methods.
AvailableHarford County DPW Water and Sewer seeks bids to furnish and install a low pressure sewer system for 10 waterfront houses on the 500 block of Freys Road in Edgewood, Maryland. The work includes approximately 700 feet of small diameter sewer pipe, nine grinder pumps with concrete ballast, electrical wiring, testing, appurtenances, and site restoration. An IFB was opened on December 8, 2025, with bids due January 21, 2026, at 1:00 PM EST via the Bonfire portal.
Posted Date
Dec 8, 2025
Due Date
Jan 21, 2026
Release: Dec 8, 2025
Close: Jan 21, 2026
Harford County DPW Water and Sewer seeks bids to furnish and install a low pressure sewer system for 10 waterfront houses on the 500 block of Freys Road in Edgewood, Maryland. The work includes approximately 700 feet of small diameter sewer pipe, nine grinder pumps with concrete ballast, electrical wiring, testing, appurtenances, and site restoration. An IFB was opened on December 8, 2025, with bids due January 21, 2026, at 1:00 PM EST via the Bonfire portal.
The work covered by the plans and specifications includes: the installation of a new sanitary sewer main (diameter varies from 8” to 15”, with some portions of the sewer main to be bored along North Ridge Road (S.R. 20), including lateral service connections, pavement repair and restoration, and various other items. All work under this contract shall be completed within 210 days of Notice to Proceed.
Posted Date
Dec 12, 2025
Due Date
Jan 14, 2026
Release: Dec 12, 2025
Close: Jan 14, 2026
The work covered by the plans and specifications includes: the installation of a new sanitary sewer main (diameter varies from 8” to 15”, with some portions of the sewer main to be bored along North Ridge Road (S.R. 20), including lateral service connections, pavement repair and restoration, and various other items. All work under this contract shall be completed within 210 days of Notice to Proceed.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis