Summary
The East Palo Alto Sanitary District (EPASD) is soliciting proposals for preliminary and final design, bid support, and construction-phase engineering for sewer main replacement projects CIP 1.1 and CIP 1.2 in East Palo Alto. The scope includes design of approximately 4,833 feet of sewer main and 19 manholes for CIP 1.1 and 2,668 feet of sewer main and 14 manholes for CIP 1.2, plus survey, potholing, preparation of 50% and 100% PS&E, specifications, and engineer's estimates. The contract period is from a July 2026 kickoff through construction completion in December 2027 and proposals must be submitted by qualified civil engineering firms.