Summary
The purchase and installation of four shade structures for the CCA aircraft based on site. The new shade structures will be located on south ramp west of the current shade structures. 2) Column concrete footings, per footing, as needed. 3) The new shade structures will adhere to the following requirements: The shade structure will require LED lights and their conduit, CU wiring, service power outlets, a service panel and its Una-strut support assembly, and a solar battery powered obstruction light. 4) PVA (Photovoltaic Array) or solar paneling with 12 hour battery pack for LED lighting and shade structure.