Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The replacement of existing concrete pavement at the east and west building entries, construction of entry awnings, installation of roof and storm drains, and heated sidewalks. Also includes 2,963 SF of 6" concrete pavement removal; 75 LF of 10" PVC storm sewer pipe; 60 LF of 8" PVC storm sewer pipe; 65 LF of 6" PVC storm sewer pipe; 290 CY of earthwork excavation and haul off; 2,625 SF of 6" standard concrete pavement; see attached files.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
HVAC system renovations for the Band and Choir Rooms at the Jr./Sr. High School Building, as well as the reconstruction of an exterior sidewalk at the north side of the band room/weight room wing of the building.
Posted Date
Jan 19, 2026
Due Date
Feb 3, 2026
Release: Jan 19, 2026
Close: Feb 3, 2026
HVAC system renovations for the Band and Choir Rooms at the Jr./Sr. High School Building, as well as the reconstruction of an exterior sidewalk at the north side of the band room/weight room wing of the building.
AvailableThe project consists of the general trades, mechanical, electrical, controls, tab, gc for all work packages and other related work indicated in the drawings and specifications.
Posted Date
Jan 2, 2026
Due Date
Feb 2, 2026
Release: Jan 2, 2026
Close: Feb 2, 2026
The project consists of the general trades, mechanical, electrical, controls, tab, gc for all work packages and other related work indicated in the drawings and specifications.
AvailableSupply pricing for time and materials to install one 48-strand single-mode fiber optic cable run of approximately 1100 lineal feet from Clay City Jr/Sr Hight School to the concession stand 36 strands will be terminated in the cabinet in the concession stand and six strands will go from the concession stand to the press box and six strands from the concession stand to fuel pump each terminated into vendor-supplied shelves in IDF/MDF. The outdoor portion of the fiber run will be bored under the existing parking lot and otherwise buried throughout. The outdoor fiber should be installed in 2” conduit rather than direct-buried.
Posted Date
Jan 13, 2026
Due Date
Feb 9, 2026
Release: Jan 13, 2026
Close: Feb 9, 2026
Supply pricing for time and materials to install one 48-strand single-mode fiber optic cable run of approximately 1100 lineal feet from Clay City Jr/Sr Hight School to the concession stand 36 strands will be terminated in the cabinet in the concession stand and six strands will go from the concession stand to the press box and six strands from the concession stand to fuel pump each terminated into vendor-supplied shelves in IDF/MDF. The outdoor portion of the fiber run will be bored under the existing parking lot and otherwise buried throughout. The outdoor fiber should be installed in 2” conduit rather than direct-buried.
Edgemont Union Free School District is soliciting sealed bids for masonry restoration and paving upgrades at the Edgemont Jr./Sr. High School gym building. Bidding documents are available beginning January 21, 2026 via REVPlans or BidNet Direct, with a non-mandatory pre-bid meeting on February 4, 2026 at 3:30 PM. Proposals are due February 12, 2026 at 11:00 AM at the District’s Facilities Department Office in Scarsdale, NY.
Posted Date
-
Due Date
Feb 12, 2026
Close: Feb 12, 2026
Edgemont Union Free School District is soliciting sealed bids for masonry restoration and paving upgrades at the Edgemont Jr./Sr. High School gym building. Bidding documents are available beginning January 21, 2026 via REVPlans or BidNet Direct, with a non-mandatory pre-bid meeting on February 4, 2026 at 3:30 PM. Proposals are due February 12, 2026 at 11:00 AM at the District’s Facilities Department Office in Scarsdale, NY.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis