Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
4.3 MI of 8” Dia. PVC, DIP, or HDPE pipe.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work unclude lateral repair program.
Posted Date
-
Due Date
Dec 18, 2025
Release: -
Close: Dec 18, 2025
Work unclude lateral repair program.
AvailablePremium
Access the largest public sector contact database
Work includes roadway reconstruction, lateral lane.
Posted Date
Nov 13, 2025
Due Date
Dec 16, 2025
Release: Nov 13, 2025
Close: Dec 16, 2025
Work includes roadway reconstruction, lateral lane.
AvailableWork includes 30 EA ls011 system - cipp lateral lining, 8" to 10" full circle main connection, 4" or 6" x 4.5 mm lateral piping, minimum 30 LF of lateral (all depths); 260 LF ls011 system - cipp lateral lining, 4" or 6" x 4.5 mm lateral piping, beyond 30 LF of lateral (all depths); 1 LS ls011 system - bypass pumping; 337 EA ls012 system - cipp lateral lining, 8" to 10" full circle main connection, 4" or 6" x 4.5 mm lateral piping, minimum 30 LF of lateral (all depths). See attached file.
Posted Date
Sep 3, 2025
Due Date
Dec 16, 2025
Release: Sep 3, 2025
Close: Dec 16, 2025
Work includes 30 EA ls011 system - cipp lateral lining, 8" to 10" full circle main connection, 4" or 6" x 4.5 mm lateral piping, minimum 30 LF of lateral (all depths); 260 LF ls011 system - cipp lateral lining, 4" or 6" x 4.5 mm lateral piping, beyond 30 LF of lateral (all depths); 1 LS ls011 system - bypass pumping; 337 EA ls012 system - cipp lateral lining, 8" to 10" full circle main connection, 4" or 6" x 4.5 mm lateral piping, minimum 30 LF of lateral (all depths). See attached file.
AvailableRelease: -
Close: Dec 18, 2025
Woks include lateral video inspection.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis