Unity Park Field Renovation (Request for Proposals)
Work consist of 15,000 SF of removal of existing clay infield, removal of existing fence/gates/backstop, 24,000 SY of removal of existing turf/topsoil to a depth of 12", removal and capping of existing irrigation system, 40,000 SF of synthetic turf system, 315 LF of perimeter underdrain/collector pipe with fabric, 1,250 LF of composite flat drains, 800 LF of concrete perimeter curbing, 25 LF of 8" HDPE storm pipe, 750 LF of chain link fence, post and gates.